
Reelmaster 2300–D/2600–D
Page 7 – 25
Cutting Units
Fixed Side Plate Installation (Fig. 28 and Fig. 29)
1.
Remove pop rivets and rear height–of–cut plates
from both sides of the cutting unit (Fig. 28).
2.
Remove lock nuts, capscrews, washers, and both
links from the cutting unit (Fig. 28).
3.
Align fixed side plate with holes on the cutting unit
(Fig. 29).
4.
Attach new capscrews, washers, and flanged lock
nuts to the fixed side plate and the cutting unit (Fig. 29).
5.
Tighten lock nuts and capscrews
6.
Fasten new height–of–cut plate to the cutting unit
with new pop rivets (Fig. 29).
7.
Repeat steps 1. through 6. for the other side of the
cutting unit.
1. Pop
rivet
2. Height–of–cut
plate
3. Lock
nut
4. Capscrew
5. Washer
6. Link
4
6
1
2
5
3
Figure 28
1. Fixed side plate
2. Capscrews
3. Washers
4. Flanged lock nut
5. Height–of–cut
plate
6. Pop
rivet
1
5
6
3
2
4
Figure 29
Cutting Units
Summary of Contents for REELMASTER 2300-D
Page 2: ...This page is blank ...
Page 4: ...This page is blank ...
Page 10: ...Safety Page 1 6 Reelmaster 2300 D 2600 D ...
Page 12: ...Equivalents and Conversions Product Records and Manuals Page 2 2 Reelmaster 2300 D 2600 D ...
Page 14: ...Maintenance Interval Chart Product Records and Manuals Page 2 4 Reelmaster 2300 D 2600 D ...
Page 38: ...Engine Page 3 20 Reelmaster 2300 D 2600 D ...
Page 158: ...Wheels and Brakes Page 6 8 Reelmaster 2300 D 2600 D ...
Page 185: ...This page is blank ...