Figure 97
1.
Flange clamp
5.
Flanged-head
bolt
9.
Flange (master
boom valve)
2.
Gasket
6.
Valve mount
10.
Flange
(adapter
fitting—agitation
throttle valve)
3.
Manifold
(agitation
valve)
7.
Flanged
locknut
4.
Flange
(manifold—agitation
bypass valve)
8.
Flange (rate
control valve)
2.
Assemble the agitation bypass valve, gasket, and
agitation valve manifold with a clamp tightened hand
tight (A of
).
3.
Align a 1 gasket between the flanges of the rate control
valve and the agitation valve manifold (B of
4.
Assemble the rate control valve, gasket, and agitation
valve manifold with a clamp tightened hand tight ( B of
5.
Align a 1 gasket between the flanges of the agitation
valve manifold and the master boom valve (B of
6.
Assemble the agitation valve manifold, gasket, and
master boom valve with a clamp tightened hand tight
(B of
7.
Align a 1 gasket between the flanges of the agitation
valve manifold and the adapter fitting for the agitation
throttle valve (C of
8.
Assemble the agitation valve manifold, gasket, and
adapter fitting with a clamp tightened hand tight (C of
).
9.
Assemble the agitation valve to the valve mount with
the flanged-head bolt and flanged locknut that you
removed in step
of
Removing the Agitation Manifold
and torque the nut and bolt to 1017 to
1243 N-cm (90 to 110 in-lb).
10.
If you loosened the mounting hardware for the master
boom valve, tighten the nut and bolt to 1978 to 2542
N-cm (175 to 225 in-lb).
Installing the Master Boom Manifold
Valve
1.
Align the flange of the master boom valve manifold, 1
gasket, and the flange of the master boom bypass valve
(A of
).
Figure 98
1.
Flange clamp
6.
Valve mount
2.
Gasket
7.
Flanged locknut
3.
Manifold (master boom
valve)
8.
Flange (agitation valve)
4.
Flange (bypass —master
boom valve)
9.
90° flanged elbow
5.
Flanged-head bolt
2.
Assemble the master boom valve manifold, gasket, and
master boom bypass valve with a clamp tightened hand
tight (A of
68