background image

and the shorter, rear leg of the spring is to be inserted
into the hole in the basket bracket.

6.

Check if the bracket basket rotates freely.

Important:

The plastic washer must be installed

onto the basket collar to prevent binding.

3

Installing the Cut-off Bar

Parts needed for this procedure:

1

Cut-off bar

4

Bolt (1/4 x 1–3/4 inches)

4

Locknut (1/4 inch)

Procedure

1.

Loosely mount the cut-off bar to the cutting unit frame
with 4 bolts (1/4 x 1–3/4 inches) and 4 locknuts (1/4
inch) (

Figure 5

).

Figure 5

1.

Cut-off bar

4.

Bolt (1/4 x 1–3/4 inches)

2.

Grass shield

5.

Locknut (1/4 inch)

3.

Deflector

2.

Insert a 0.060 feeler gauge between the top of the reel
and the bottom of the cut-off bar to check clearance.
Make sure the bar and reel are equal distance apart
across the full length of the reel.

Note:

The cut-off bar must not contact the reel during

operation.

3.

Tighten the bolts and locknuts (

Figure 5

).

4

Removing the 4 Grass
Deflectors

No Parts Required

Procedure

1.

Remove the 4 flange-head bolts securing the front
grass-shield to the cutting-unit frame (

Figure 5

).

Remove the grass shield.

2.

Remove 4 deflectors from the shield leaving only the 1
shown in

Figure 5

.

3.

Install the grass shield.

5

Removing the Support Tube
(For 5-inch Diameter Reels
Only)

Parts needed for this procedure:

2

Flanged locknut

Procedure

1.

Unthread the 2 flange-head bolts securing the
support tube and the cutting-unit carrier-frame to the
cutting-unit side-plates (

Figure 6

). Remove the support

tube.

Note:

Do not pull the bolts all the way out of the

carrier frame.

4

 

Reviews: