300801_en - 12/12
2. Installation - Instruction manual - SAS 16.6
2-4
2.2.
Unpacking
Crate type casing: remove all the nails with paper tubes (or unscrew all the screws) and lift out the
crate in one piece.
Case: remove the nails from the pallet and walls.
2.2.1.
Removal of the transport straps
To prevent the moving parts of the machine from being damaged during transport, locking parts
are placed around and in the interior of the machine.
Warning!
Do not remove the transport clamps until the machine is positioned and completely stabilised.
Starting condition
- Machine in place and stabilised.
Step
Key
Action / Observation
1.
Remove the wooden wedges and the cords outside the machine.
2.
Open the cover and remove the locking parts located in the interior.
Summary of Contents for SAS 16.6
Page 2: ......
Page 6: ...300801_en 12 12 Instruction manual SAS 16 6 ...
Page 22: ...300801_en 12 12 1 Installation conditions Instruction manual SAS 16 6 1 14 Fig 8 ...
Page 24: ...300801_en 12 12 1 Installation conditions Instruction manual SAS 16 6 1 16 Fig 9 ...
Page 27: ...Instruction manual SAS 16 6 2 Installation 300801_en 12 12 2 1 2 Installation ...
Page 33: ...Instruction manual SAS 16 6 2 Installation 300801_en 12 12 2 7 Fig 3 ...
Page 46: ...300801_en 12 12 2 Installation Instruction manual SAS 16 6 2 20 ...