4
DOWNHAUL
1. Attach downhaul to lower mast cleat by tying with
a bowline onto the top bar of the cleat at the foot of
the mast.
2. Feed downhaul through small metal ring on front/
foot of luff tube.
3. Then feed back through cleat on mast and lock in.
2
1
3
BOOM & KICKER
Attach kicker shackle to lower mast, attach through eye
fitted to lower mast section with a screw driver.
BOOM & OUTHAUL
1. Attach the Outhaul line to the fairlead at the end of the
boom using a bowline.
Attach kicker key to fitting on boom.
Below; Rigged Kicker
2. Then feed the outhaul forward and through the eye
of the sail.
3. Then feed back through the fairlead.
2
1
3
4. Then feed forward along boom.
4