4.2.3
Front Cross Beam
Remove the bolts from the side walls and store in a container for easy access when assembling.
Lift the front cross beam assembly using slings around the top ripper cylinder pins and the
cushion hitch cylinder pin. Move the cross beam assembly into place travelling rearward. The side
walls may need to be moved outward to the maximum extent the play in the main pivot bushes
will allow. Align a bolt hole on each side towards the top of the bolt group and insert the bolt.
Lower or raise the cross beam to allow the remaining holes to align. Fit and tighten the M20
fasteners with a recommended assembly torque of 370N.m.
Figure 4.3 Assembly Step 3