- 17 -
(3) Squeeze trigger switch to start tightening (Figure 4).
(Figure 4)
(4) Rotating speed gradually shows down as the tightening proceeds, then bolt
pintail shears off when designated torque is reached (Figure 5).
(Figure 5)
(5) When tightening is completed, remove wrench from bolt/nut assembly.
Sheared-off bolt pintail remains in Inner Socket (Figure 6).
(Figure 6)
(6) Pull Ejector Lever to eject bolt pintail (Figure 7).
Keep pintail in designated bag.
(Figure 7)
Summary of Contents for GX361ZA-UC
Page 14: ... 13 4 PART NAME ACCESSORIES Figure 1 ...
Page 26: ... 25 MEMO ...
Page 27: ... 26 MEMO ...
Page 28: ...IMKAXXX ...