W W W . T M G I N D U S T R I A L . C O M P 5 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Mark the ground in the final building location with a line showing the positions of
base plates, front, and rear doors. All lines should be drawn from center to center of
all baseplate tubes. Diagonal line X must be equal to Y.
Baseplates: all baseplates must be installed firmly with expansion bolts (#16) on
this step (picture 1).
Parts used in this step :
-
(4) Baseplates (#5L, #5R)
-
(26) Baseplates (#7)
-
(4) Baseplates (#6)
-
(98) Expansion bolts (#16)
Picture 1