Thank you very much for choosing our company's Cantaport products.

Please be sure to thoroughly read these instructions for assembling the Cantaport product in conjunction with the engineering 

details. DIY or Authorisied Cantaport installations must follow the manufactures assembling manual to avoid warranty cover. 

Please retain the manual for future reference and maintenance inspection. 

Precautions during construction

The Cantaport is a simple structure. Do not change or remodel it without gaining

certification from Cantaport to avoid warranty or danger to public.

The snow accumulation strength is 600N/m2 (61.2kg/m2) which corresponds to 20cm

of fresh snowfall (specific weight 0.3). Do not install in heavy snow area.

Do not install it in the place where snow slides down from the building roof directly.

There is a possibility that products are damaged by snow falling.

When installing it besides wall, etc., keep enough clearance between the product and

the wall due to avoid damage during strong winds. 100mm-200mm clearance.

Do not install in locations subject to strong wind directly/constantly underneath the roof.

When installing, it is recommended to install the front frame facing towards the building to reduce the wind effect.

When installing with side panel  please be sure to install the support post.

Positioning the posts so that they do not affect underground services (water supply, drain pipes, etc.).

When moving the posts, please follow the manufactures specifications detailed in this manual.

Install so that the exhaust of hot-water steam, heating fumes and/or car exhaust do not directly hit the surface of the supports

and around the entire frame. This may cause discolouration of the surface structure.

enough 

space

enough 

space

concrete wall 

etc

TO BE READ INCONJUCTION WITH THE PJR SINGLE

INSTALLATION MANUAL.

Summary of Contents for PJF Series

Page 1: ...lides down from the building roof directly There is a possibility that products are damaged by snow falling When installing it besides wall etc keep enough clearance between the product and the wall d...

Page 2: ...and in line short extension of M connection type Strike the front frames and do sealing work below figure A part Peel the back sheet of water proof cover and attach the water proof cover on the joint...

Page 3: ...n in line part Water proof cover GB8203 PJR GWC 1 Shape 4 2 PJFG B PJFG B 1 4 2 PJFG B PJFG B 1 2 PJFG B PJFG B 1 3 2 PJFG B PJFG B 1 9 8 5 4 PJFG B PJFG B 1 Washer 8 8 4 PJFG B PJFG B 1 16 8 PJFG B P...

Page 4: ...e post for D33 104 7mm deeper than the post for D18 In case of f implant the post for D24 20 4mm deeper than the post for D21 In case of g implant the post for D27 41 5mm deeper than the post for D21...

Page 5: ...et Connect the beams with the beam connecting bracket as the clearance between D1 front frame and D2 front frame is 20mm Washer 8 9 Make holes on site Connecting material Beam Beam connecting bracket...

Page 6: ...rame connecting parts Figure A temporary fixing Fix the front frame connecting parts to the back plate inserted into the connecting material with small truss screw 5 15 10 Front frame connecting part...

Page 7: ...connecting cap Insert the connecting cap to connecting material and fix with drilling screw 4 10 8 Do sealing work to the touching part Drilling screw 4 10 8 Front frame Connecting cap Connecting mat...