1
TABLE OF CONTENTS
Page (s)
Description and Specifications ........................................................................................................................................1
Installation Restrictions .................................................................................................................................................2
Cautions .........................................................................................................................................................................2
Safety Inspection of a Previously Used Appliance .....................................................................................................2, 3
SS1R Terminology .........................................................................................................................................................3
LED Status / Fault Indicators and Fault Retrieval from Memory .....................................................................................3
SS1R With Integral UC1 Universal Control Board Features ..........................................................................................4
Pre / Post-Purge & Pre-Cycle Prover Status Check Settings......................................................................................4, 5
Vent Hood Termination Clearances For U.S. Installations ..........................................................................................5, 6
Vent Hood Termination Clearances For Canadian Installations..................................................................................6, 7
Installation
Tools Required .................................................................................................................................................7
Vent Hood Terminus Installation ..................................................................................................................7, 8
Installation of Rain Shield .................................................................................................................................8
Plenum Installation .......................................................................................................................................8, 9
Installation of Plenum Wall Support Bracket .....................................................................................................9
Installation of Vent Pipe ..............................................................................................................................9, 10
Electrical Wiring
Wiring Restrictions ..........................................................................................................................................11
Installation of Oil Solenoid Valve on "D" & “F” Series oil furnaces (-OBD, F-XXX, -OPD, F-XXX and etc.) ...11
Field Wiring Connections & Sequence of Operation.....................................................................11, 12, 13, 14
Selection of Proper Bleed Orifice & Draft Adjustment ............................................................................................14, 15
Combustion Air .............................................................................................................................................................15
System Operation Check Out .......................................................................................................................................15
Troubleshooting Oil Odors.......................................................................................................................................15, 16
Troubleshooting Electrical Problems .................................................................................................................16, 17, 18
Maintenance ..................................................................................................................................................................18
Removal & Replacement of Motor/Wheel ......................................................................................................18
Warranty ........................................................................................................................................................................19
Mounting Templates
Template B Motor Notch ................................................................................................................................20
Template A Vent Hood Terminus....................................................................................................................21
SideShot
®
is a registered trademark of Tjernlund Products, Inc. for their Model SS1R Vent System.
DESCRIPTION
The SS1R is a mechanical vent system designed and listed for use with specified Rheem, Ruud, Weatherking and Heat Controller oil
fired furnaces. The SS1R automatically vents the flue gases away from the oil furnace to the outdoors. By combining outside air
with high-tech insulation and maintaining required clearances, surrounding combustible materials remain at safe temperatures. A
factory post-purge time is set at 2 minutes and is adjustable up to 16 minutes, see “Pre / Post-purge Settings” on page 4. The
SS1R features a safety system consisting of the integral UC1 Universal Control, a Fan Proving Switch and a High Limit tempera-
ture control. These devices monitor the SS1R’s performance and will interrupt the main burner if a venting malfunction is detected.
APPLICATION TABLE
Verify that the total BTU/hr. input of the heating appliance(s) fall
within the proper category listed below. All BTU/hr. capacity ranges
are based on a maximum of 10 linear feet of vent pipe with no more
than 3 - 90
0
elbows. (Two 45
0
elbows are equivalent to one 90
0
elbow)
SPECIFICATIONS
Motor:
115/1/60, 3300 RPM, 212 watts, 2.28 FLA
Fan Proving Switch:
Non-adjustable set point of -.04" W.C.
High Limit:
Manual reset, N/C contacts, open at 135oF + 10oF.
UC1 Universal Control:
See UC1 Universal Control Board Features on page 4.
Pre-Purge:
Options (0, 5, 20, 35 seconds);
Post-Purge:
Factory set at 2 minutes, Options (0, 30 seconds or 1, 2, 4, 8, 16 minutes).
See page 4 for Pre / Post-purge options.
Oil Solenoid Valve:
ON - Off control of oil flow to burner; 3-8 second valve opening delay; 120 VAC, .115 Amps, 13.8 VA
12 1/4"
16 1/2"
27 3/8"
A
B
C
15 1/8"
8"
D
13 3/4"
E
F
7 3/4"
G
14 3/4"
H
23 1/4"
I
Rough-In
8” Height
8 3/8” Width
FRONT VIEW
SIDE VIEW