Please retain instructions for future reference
17
Step 6:
PENT ROOF PANEL INSTALLATION
• Attach roof panels as shown. Rest Pent roof panel on the
High Side Top and side panel on the opposite side.
(Detail T1 & T2)
• Butt Pent roof panel tightly against Pent Gable Top.
• Make sure all panels are square before fixing together.
• Secure to Pent Gable Tops using 2x 50mm
(S50)
screws per roof panel.
(Detail U)
• For multi roof models, secure Pent roof panels together
using 2x 50mm
(S50)
screws per roof panel.
(Detail V)
T2
T1
Step 7:
FELT INSTALLATION
• Roll out felt along lower part of roof,
leaving sufficient overhang to fold down
onto roof purlin, approx 75mm/3”.
Do not fold underneath roof.
• Use clout
(CN13)
nails to tack top of felt
into the roof panel.
• Repeat for the other side. Fold the
overhang at gable ends under the roof
panel and tack in place.
• Ridge piece should overlap the lower
strips and tack into place (if supplied).
• Felt illustration for 8’x6’ model.
CN13
S50
U
V
S50
S50
S50
S50