![Tiger TIGERFLEX NOVA General Assembly Instructions Download Page 2](http://html1.mh-extra.com/html/tiger/tigerflex-nova/tigerflex-nova_general-assembly-instructions_1114937002.webp)
BEFORE YOU GET STARTED
Please retain instructions for future reference
PLEASE READ INSTRUCTIONS CAREFULLY
• Check the pack and make sure you have all the parts listed.
• When you are ready to start, make sure you have the right tools at hand (not supplied).
• Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood logs may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can
be mitigated. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Please do not paint or treat your cabin timbers before assembly as they must stay dry for a snug tongue and
groove fit. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL that your building is
treated with a suitable wood preserver or paint AFTER assembly, both internally and externally.
BUILDING A BASE
Care must be taken to ensure the product is placed on a suitable base. When thinking about where the building
and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is firm and level and is built on firm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm
above the surrounding ground level to avoid flooding.
TYPES OF BASE
• Durable plastic grid.
• Concrete 75mm laid on top of 75mm hard-core.
• Slabs laid on 50mm of sharp sand.
• Timber Base - Self constructed/Buy pre-made.
*We recommend a Fastfit EcoBase for your building. It is durable, lightweight, flexible and easy to put in place.
Please see tigersheds.com for details.
WOOD WARPING
MAY OCCUR
WINTER
EXPANSION
SUMMER
CONTRACTION
PLASTIC BASE
CONCRETE BASE
SLAB BASE
TIMBER BASE
BROKEN SLABS
BARE SOIL
LOOSE GRAVEL
CAUTION:
All buildings should be erected
by two competent adults.
CAUTION:
It is advisable to wear safety
gloves during building installation.
Whilst all products manufactured are made to the highest standards of safety and in the case of children’s products independently tested to
EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
GO WITH THE PRO!:
We understand how busy life can be: our Pro-Installation service can take the stress and strain out of assembling your
quality Tiger building for you. We recommend using professional and dedicated installers to erect your building. With their
knowledge and experience, they will ensure that your cabin is put properly in place ready for you to enjoy your space for
years to come.
If you have not booked our Pro-Installation service and would like to arrange an installation, please contact our friendly
customer team on 0113 205 4189 (Mon – Fri 9am-5pm) or email [email protected].
• The pro-install team will contact you to arrange a suitable time and date for the fitting.
• Sit back, relax and let our professional home installation service do all the hard work for you!
• Please view our Pro Installation page for full terms and conditions.
MADE IN THE UK SINCE 1913.
We have been making our high quality, great
value sheds here in Britain for decades.
03
02
tigersheds.com
0113 205 4189