23
22
tigersheds.com
0113 205 4189
Please retain instructions for future reference
12’x6’ TIGERFLEX
®
NOVA LOG CABIN INSTRUCTIONS
Step 14:
FELTING THE ROOF
• Roll out felt along lower part of roof, leaving sufficient overhang to fold down onto roof edge.
Note: Do not fold underneath roof.
• Use clout nails
(C13)
to tack top of felt section 1 to the roof panels. Repeat for felt section 2.
• Fold the overhanging felt at ends under roof panel and tack in place.
• Felt section 3 should overlap the lower strips and tack into place.
1
2
3
Ridge piece should
overlap the lower strips
and tack into place.
C13
Step 14:
FELTING THE ROOF
(MODULE PACKS: R)
• Fit barge boards to the roof panels,
trapping overhanging end of the felt
in between to provide a weather
proof seal. Secure using 2x 40mm
(N40)
nails per barge board
• Secure finial over the top of the
barge boards using 2x 40mm
(N40)
nails
per barge board
N40
ROOF COVERING OPTIONS
All Tiger buildings are designed to use
TigerFelt
®
high grade poly-backed durable mineral roofing felt. If you
have chosen a different roof covering option – such as EPDM rubberised roof covering or Cabin Shingles, please
see their separate roofing instructions available on their product pages at
tigersheds.com
. Please note that for
Shingles, we recommend still using the felt roof cover as an underlayer for the shingles to improve weather
resistance yet further.
MAINTENANCE
To validate your guarantee and ensure longevity of the product, it is ESSENTIAL that your building is treated with
a suitable wood preserver or paint AFTER assembly, both internally and externally. For the continued protection
for unpainted areas of your garden building we recommend maintaining your timber treatment with
TigerSkin
®
preserver. This solvent based wood treatment will penetrate deep into the wood giving years of protection
against the weather and also enhance timber grain with a rich long lasting protection. A water repellent formula
which is harmless to plants when dry, it is available in a wide range of colours to refresh the look and feel of your
wood. Discover more at
tigersheds.com
.
SETTLING IN
Once the building has been erected, the timber logs and framing may need to settle and acclimatise to the
environment, so we would suggest that the door and window fittings are temporarily loosened (but not removed)
to allow for this.
GO WITH THE PRO!
We understand how busy life can be: our Pro-Installation service can take the stress and strain out of assembling your
quality Tiger building for you. We recommend using professional and dedicated installers to erect your building. With their
knowledge and experience, they will ensure that your shed or cabin is put properly in place ready for you to enjoy your space
for years to come.
If you have not booked our Pro-Installation service and would like to arrange an installation, please contact our friendly
customer team on 0113 205 4189 (Mon – Fri 9am-5pm) or email [email protected].
• The pro-install team will then contact you to arrange a suitable time and date for the fitting.
• Sit back, relax and let our professional home installation service do all the hard work for you!
• Please view our Pro Installation page for full terms and conditions.
NEED HELP?
If you need any help with parts of the build please see the handy HELP section on the Tiger website which
has articles, guides and videos that may help you. If you have other questions, please call 0113 2054189 for
Customer Support or use the Items Delivered Query form at
tigersheds.com/contact.