Maintenance Section 5-2
MAINTENANCE
RBF-14C 07/04
© 2004
Alamo Group Inc.
LUBRICATION
Gearbox
The gearbox on the machine is filled with 10W/30 oil before it leaves the factory and should not need
topping-off, although it is recommended that the oil level is checked before the machine is used. Change
the oil after the first 200 hours of operation and thereafter every 1600 hours of operation.
Grease Points
All grease points shown in
FIGURE 5-1
below should be greased before operating the machine. To make
greasing easier by relieving the weight form the pivot pins, rest the rotor unit on the ground, stop tractor
engine and operate control levers in both directions. Grease daily or every 8 hours of operation. Use a
high quality lithium base #2 grease.
PTO Drive Tubes
Grease PTO square tubes before operating machine. Grease the PTO bearings every 8 hours of operation
FIGURE 5-1
A. 1st Ram Pivots
2 Fittings
B. Breakout Ram Pivot
2 Fittings
C. P.T.O. Shaft
2 Fittings
D. 1st Arm Pivot (Base)
1 Fitting
E. 2nd Ram Pivots
2 Fittings
F. 1st and 2nd Arm Pivot
2 Fittings
G. 3rd Ram Pivots
2 Fittings
H. Rotor Link / Ram Pivot
2 Fittings
I.
Rotor Link Pivot
1 Fitting
L.
Rotor Unit Pivot
1 Fitting
M. Rotor Shaft Bearing
1 Fittings
Total
20 Fittings
*NOTE:
Lubricate flail roller bearing until lubricant
can be seen coming out between
roller and bearing housing.
Summary of Contents for RBF-14C
Page 4: ......
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 33: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 35: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 42: ...Assembly Section 3 8 RBF 14C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 6...
Page 47: ...Assembly Section 3 13 RBF 14C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 12...
Page 50: ......
Page 51: ...Operation Section 4 1 OPERATION SECTION...
Page 73: ...Operation Section 4 23 OPERATION RBF 14C 07 04 2004 Alamo Group Inc...
Page 82: ......
Page 83: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 91: ...RBF 14C OMWPL 07 04 Printed U S A P N 06060002...