Operation Section 4-11
OPERATION
RBF-14C 07/04
© 2004
Alamo Group Inc.
6.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be repaired
and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
¾
Ensure that the Manual Canister is secured to the
Boom unit with the Operator’s Manual inside.
¾
Ensure all decals are in place and legible. Replace
missing, worn, and non-legible decals.
NOTE:
The mower Operator’s Manual and affixed
Decals contain important instructions on the safe and
proper use of the mower. Maintain these important
safety features on the mower in good condition to ensure
the information is available to the operator at all times.
BOOM ARM ASSEMBLY
¾
Inspect condition of each arm section weldment
¾
Ensure all pins are in place.
¾
Ensure all bolts and screws are properly installed.
¾
Check condition of teflon bushings at boom pivot
points.
¾
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
¾
Ensure that all joints are lubricated. See
Maintenance Section for Lubrication Chart.
FRAME ASSEMBLY
¾
Inspect condition of mounting frame weldment.
¾
Inspect condition of King Post frame.
¾
Ensure all bolts and screws are in position and are
properly torqued.
¾
Ensure all pins are in place and fastened with
screws.
¾
Ensure frame is properly mounted to tractor and
hardware is properly installed and tightened.
WARNING!
Never attempt to lubricate, adjust, or remove material from the Implement while it is in motion
or while tractor engine is running. Make sure the tractor engine is off before working on the
Implement.
(SG-20)
Frame
Weldment
Summary of Contents for RBF-14C
Page 4: ......
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 33: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 35: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 42: ...Assembly Section 3 8 RBF 14C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 6...
Page 47: ...Assembly Section 3 13 RBF 14C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 12...
Page 50: ......
Page 51: ...Operation Section 4 1 OPERATION SECTION...
Page 73: ...Operation Section 4 23 OPERATION RBF 14C 07 04 2004 Alamo Group Inc...
Page 82: ......
Page 83: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 91: ...RBF 14C OMWPL 07 04 Printed U S A P N 06060002...