
TieYak.com
Page 3
06/19
Assembly
Parts Needed
End (Male))
Center (1)
Lock Washer (4)
Thick Washer (4)
End (Female)
Tower Post
Insert
Post
into
Base Post
. Position
the
Post
so that the two welded nuts
are on the back side.
Secure the
Post
using two 3/4”
Hex
Bolts
,
Lock Washer
and
Thick Washer
.
Repeat for second tower.
Parts Needed
Post (2)
Lock Washer (4)
Thick Washer (4)
For technical assistance or replacement parts: Call 866.787.7369
3/4” Hex Bolt (4)
3/4” Hex Bolt (4)
Assembly Cross
-
Bar
Cross
-
Bar
can be assembled in either 4’ or 6’ lengths based on length of
your Kayak/SUP:
If length is shorter than 12’, see Step 1 (4’ assembly).
If length is longer than 12’ see Step 2 (6’ assembly).
Step 1: To assemble 4’ Cross
-
Bar:
Insert
End (Male)
into
End (Female)
and secure with two
3/4” Hex
Bolts
,
Lock Washer
, and
Thick Washer
.
Step 2: To assemble 6’ Cross
-
Bar:
Attach
End (Male), Center
, and
End (Female).
Secure with four
3/4” Hex Bolts
,
Lock Washer
, and
Thick Washer
.