TieYak 97-6090 Manual Download Page 2

 

TieYak.com

 

Page 2

 

06/19

 

Assembly

 

Tower Base

 

1.

 

Welded nuts on 24” Base and 
Base Legs need to be 

 

face

-

down to attach Leveling 

Feet in Step 2.

 

2.

 

Slide 

Base Post 

over 

Base 

with holes lined up.  

 

3.

 

Hold 

Base Leg 

to 

Base Post 

(

the side with the square hole

)

and line up square holes.  In-
sert two 

Carriage Bolts 

hori-

zontally through all holes with 

Washer 

and

 Lock Nut 

on back-

side. Tighten securely. 

 

 

Repeat for second tower. 

 

Parts Needed

 

3” Carriage Bolt (4)

 

24” Base (2)

 

24”Base Post (2)

 

20”Base Leg  (2)

 

Lock Nut (4)

 

Leveling Feet

 

1.

 

The 

Anchor  

is used when anchoring 

Base 

to floor, ground or dock. These 

may be omitted when 

Base 

is on 

 

a stable level surface/environment. 

 

2.

 

For use with 

Anchors

, remove first 

Hex 

Nut 

from 

Leveling Foot

, place 

Anchor  

on foot and then screw 

Hex Nut 

back 

on. Screw into 

Base

.

 

 

For use without 

Anchors

, leave one 

 

of the 

Hex Nuts 

on 

Leveling Feet 

and 

then screw four 

Leveling Feet

 into 

welded nut in each 

Base

.  

 

Repeat for second tower.

 

Parts Needed

 

Anchor (6)

 

Leveling Foot (6)

 

For technical assistance or replacement parts: Call 866.787.7369

 

Washer (4)

 

Reviews: