
TieYak.com
Page 2
06/19
Assembly
Tower Base
1.
Welded nuts on 24” Base and
Base Legs need to be
face
-
down to attach Leveling
Feet in Step 2.
2.
Slide
Base Post
over
Base
with holes lined up.
3.
Hold
Base Leg
to
Base Post
(
the side with the square hole
)
and line up square holes. In-
sert two
Carriage Bolts
hori-
zontally through all holes with
Washer
and
Lock Nut
on back-
side. Tighten securely.
Repeat for second tower.
Parts Needed
3” Carriage Bolt (4)
24” Base (2)
24”Base Post (2)
20”Base Leg (2)
Lock Nut (4)
Leveling Feet
1.
The
Anchor
is used when anchoring
Base
to floor, ground or dock. These
may be omitted when
Base
is on
a stable level surface/environment.
2.
For use with
Anchors
, remove first
Hex
Nut
from
Leveling Foot
, place
Anchor
on foot and then screw
Hex Nut
back
on. Screw into
Base
.
For use without
Anchors
, leave one
of the
Hex Nuts
on
Leveling Feet
and
then screw four
Leveling Feet
into
welded nut in each
Base
.
Repeat for second tower.
Parts Needed
Anchor (6)
Leveling Foot (6)
For technical assistance or replacement parts: Call 866.787.7369
Washer (4)