TIANJIN BAILI ERTONG MACHINERY QBR3 Operation Manual Download Page 5

so as to ensure the cable’s rubber jacket is in the hole of the “sealing plug”. 

2.2.7 Screw the gland nut to compress the sealing rubber plug and make it combine firmly with cable’s 

rubber jacket. Connect the grounding core wire of the cable with the inner grounding screw of the wiring 

box. 

2.2.8 Put on the wiring box case. 

2.2.9 Connect the actuator’s external ground, and it should be reliable and safe.     

2.2.10 The design service life of actuator is 8000 times. 

2.2.11 According to the regulations on the recycling and treatment of waste electrical and electronic 

products, please comply with the relevant national regulations and properly dispose of waste products. Or 

call our after-sales service department for recycling. Tel: 022-26740033. 

 

2.3 Cable shall be correctly connected to avoid the rain leaking into the electric

 

actuator 

(the first two connection patterns are right in the following picture.)   

 

3.

 

Product adjusting 

 The torque mechanism has been tested and set up before delivered from the factory. It complies with the 

maximum torque value written on the nameplate. User does not need to readjust. (see Fig.2) Besides, fasten 

two mechanical limit screws on the main case body. It is better not to unscrew the mechanical limit screws 

if there is no special condition.   

 Potentiometer’s gear and potentiometer shall be loosened in case of any damage to the potentiometer. 

 The cam on the limit control mechanism is Closing Cam. OPEN and CLOSE have been marked on the 

torque control mechanism. 

3.1 The adjustment for the limit control mechanism (including adjustment for positioner 
and potentiometer.) 

A. Make the valve at the middle position. 

B. Start the motor and then make sure if the rotation direction of the valve is right while it is of 

electric-driven. If wrong, change power phase sequence.   

Summary of Contents for QBR3

Page 1: ...d this Operation Manual carefully before using this product SM 20 QBR3 QBR5 Quarter turn Electric Valve Actuator Operation Manual Tianjin Baili Ertong Machinery Co Ltd Former Tianjin No 2 General Machinery Factory ...

Page 2: ...Content 1 Product instruction 1 2 Electric wiring 2 3 Product adjusting 3 4 Additional Instruction for Explosion proof product 4 5 Comprehensive test and notice 5 ...

Page 3: ...e medium 1 2 9 Electric port total number of M33 1 5 is 2 1 3Majorstructureandfunction 1 3 1 Motor YDF specialized electric valve motor This kind of motor complies with relatednationalstandardanditstorqueperformancecomplieswithvalve sloadingperformance 1 3 2Reducermechanism it applies first class spur gear first class worm gear and first class NN type planetary reducer 1 3 3Limitcontrolandposition...

Page 4: ...ensure that the cable will not influence other working parts in the control case 2 1 4 Put the sealing ring and gasket into the case s screw hole rotate gland nut and compress sealing ring so as to make it closely contact with cable s edge 2 1 5 Inner grounding and external grounding should be fixed and reliable 2 2 Wiring steps for explosion proof type of electric actuator see Fig 4 2 2 1 Remove ...

Page 5: ... rain leaking into the electric actuator the first two connection patterns are right in the following picture 3 Product adjusting The torque mechanism has been tested and set up before delivered from the factory It complies with the maximum torque value written on the nameplate User does not need to readjust see Fig 2 Besides fasten two mechanical limit screws on the main case body It is better no...

Page 6: ...s gear and make it to be meshed To confirm it is meshed before fasten the screw Take care of the limit position or it would be damaged 3 3Adjustment for the mechanical limit screws A To make sure in which valve position the screw limits before adjusting the mechanical limit screw While turning the valve right is to close the limit screw on the right side is closing limit and the limit screw on the...

Page 7: ... Besides the Manual Operation a copy of electric schematic diagram has been provided User shall strictly follow the terminal diagram while wiring Wiring lug shall be applied The wiring lug shall not exposed or loosened Uplift the plastic jacket of the wiring lug same direction to make sure an appropriate leakage distance Any electric conductor cannot be left in the wiring case 5 Comprehensive test...

Page 8: ...inal protection function in the above conditions 2 At the end of operation replace the cover When fastening the clamp nuts at wire inlet and outlet make sure that no adverse elements such as severe damp water and dust etc that could weaken protective performance left in the inner space 3 In the course of mounting covers make sure that rubber seal rings are not damaged and fasteners are securely sc...

Reviews: