background image

 

15 

 

TERMS & CONDITIONS OF SALE: 

 

1.  Work for special build machines will not commence unless a 30% deposit has been made 

and/or official purchase order has been received. 

2.  The final configuration and optional extras are to be agreed to before manufacturing 

commences. An extra cost for changing a model will apply after manufacturing has started 
(if this change leads to extra manufacturing cost or more expensive/extra components) and 
be charged as a variation cost.  

3.  Ownership/title of all equipment remains the property of ThoroughClean until paid for in full. 

Warranty will only be available after this time. 

4.  Warranty is not service. Any calls placed to service equipment will be chargeable to the 

client. Earlier replacement of consumable parts than what is required by the maintenance 
schedule will be at the cost of the client (excluding of course any repairs/replacement of 
parts required under warranty). Please see the LIMITED WARRANTY information 
elsewhere in this document. 

5.  All Rental Spec and Mine Spec model frames will have a hot dip galvanized finish unless 

elsewhere agreed to in a proposal offered to the client. Industrial Spec frames will have a 
painted finish or galvanized finish – the latter usually at extra cost. 

6.  Any additional spares, service kits, nozzle kits, etc are excluded, unless otherwise 

mentioned in the proposal to the client.  

7.  Any extra installation and fitting expenses and all electrical or plumbing work required 

during installation will be at the cost of the client. It is the responsibility of the client to 
provide adequate pressured water supply of potable quality 15% more than the required 
flow of the pressure pump specification, and suitable power supply outlet for electrical units 
where applicable. 

8.  No responsibility will be taken for late delivery day due to unforeseen circumstances. 

Please regard building times for special builds and machines out of stock as estimates only. 

9.  Sale of this unit/s is on an FOB Bundamba, QLD basis unless otherwise agreed to in 

writing in this proposal and it is the responsibility of the client to insure goods in transit. 

10.  Our price quoted is valid for 30 days only unless stated otherwise elsewhere in the quote. 
11.  Where deposits have been paid on special builds, such deposits will in part or in full 

become non-refundable once building has started. Should a customer decide to cancel an 
order - all labour and a re-stocking and administration fee for components will be charged 
to the customer and the balance (if any) repaid to the customer. Any special non-
restockable components will be invoiced to the customer. 

12.  All prices quoted are excluding GST and freight unless otherwise stated.  
13.  All prices quoted does not include installation (where applicable) or training unless 

otherwise stated. 

14.  Installation and training service of $90/h available in Brisbane Metro only. Other sites 

subject to additional travel cost.  

15.  IN NO EVENT SHALL THOROUGHCLEAN BE LIABLE FOR ANY INJURY, EXPENSES, 

PROFITS, LOSS OR DAMAGE, DIRECT, INCIDENTAL, OR CONSEQUENTIAL, OR ANY 
OTHER PECUNIARY LOSS ARISING OUT OF THE USE OR INABILITY TO USE ANY 
PRODUCT DESCRIBED IN THIS DOCUMENT.  

 
 
 
 
 
 
 
 
DISCLAIMER: Although care has been taken to ensure the accuracy, completeness and reliability 
of the information provided, technical features may vary due to ongoing improvements and 
development.  The user of the information agrees that the information is subject to change without 
notice. 

Summary of Contents for P13C-36C

Page 1: ...R 30C TO P20R 43C T P20R 43C TO Index Page 2 Technical data Specifications 3 4 Installation Start up 5 Operating Tips Shutting down Regular Checks 6 7 Maintenance Schedule 8 9 Trouble Shooting Guide 1...

Page 2: ...50 psi 18 lpm Set up de rated pressure flow 1600 psi 14 lpm 3500 psi 17 lpm 2600 psi 18 lpm 3000 psi 18 lpm Or 3500psi 18 lpm 3000 psi 18 lpm Vs 3000 3500 psi Nozzle size at set up pressure 15060 1504...

Page 3: ...To Start Ensure that the main RED ON OFF switch is switched to OFF Ensure the Choke is ON Moved fully to the left when engine is cold Ensure Fuel is OPEN Fuel lever moved all the way to the right Now...

Page 4: ...at comfortable revs set to the power requirement for the pump pressure and flow DO NOT ALTER REMEMBER Check for leaks and Oil Levels DAILY OPERATING CLEANING TIPS 1 Using a Fan Jet first blast off hea...

Page 5: ...ure safety protective gear is used and in good state of repair Ensure Safety MEDIC ALERT Card is handy Prolonged by pass Leaving the unit in prolonged by pass machine is switched on but trigger is not...

Page 6: ...90 YES YES YES 10 Strip and Refurbish pump Replace Plunger Rod Oil Seals 3 pump Replace Brass Valves 6 pump Replace various seals 3 pump Replace Ceramic Piston Plungers if cracked or worn 3 pump Only...

Page 7: ...swivels H P Hoses are usually uneconomical to repair Replace as necessary Remember to check filters regularly and clean under running water The correct procedure for replacing the filter mesh in the s...

Page 8: ...system Check suction hose Increase diameter size for bigger supply Damaged ceramic plunger Replace Plunger SHORT PLUNGER SEAL LIFE Excessive pressure and or temp in the pumped water Check the tempera...

Page 9: ...ton Check Replace OIL IN PUMP EMULSIFIED CONTAMINATED BY WATER water in the oil Water Blasted into Pump via Breather Cap during Cleaning Exercise Care H P Piston Seals Worn or Check and Replace Seal P...

Page 10: ...lost through by pass valve and only small increase in pressure is achieved doing this Lost of waster horse power When orifice is reduced the PSI will rise and then by pass valve will dump thinking the...

Page 11: ...r Always carefully test on a small area first ALWAYS WEAR PROTECTIVE GEAR PPE i e Head face eye protection wet weather gear boots and gloves which is particularly important where hot water or aggressi...

Page 12: ...ling the safety tag off the machine and taking it with you to the doctor Tell the doctor what type of project task was being performed at the time of the injury making special note of any chemicals th...

Page 13: ...cement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if goods fail to be of acceptable...

Page 14: ...y period THIS WARRANTY WILL NOT APPLY TO Any part component that has been subject to misuse negligence accidental damage improper or inadequate maintenance or improper storage Any part that has been s...

Page 15: ...n the required flow of the pressure pump specification and suitable power supply outlet for electrical units where applicable 8 No responsibility will be taken for late delivery day due to unforeseen...

Page 16: ......

Page 17: ...spring Molla valvola 6 20 0604 00 Valve cage Gabbia valvola 6 21 1400 02 Washer Rosetta 6 5 8 4 22 1802 07 Hexagonal screw Vite M6x18 8 4 23 0205 01 Shaft protector Protezione albero 1 24 0500 09 Open...

Page 18: ...52 0500 15 Motor flange Flangia motore 1 Part available Particolare disponibile in kit only solo in kit Part available Particolare disponibile in kit also anche in kit Part Number Description Codice...

Page 19: ......

Page 20: ...3 6 6 10 8 GPM 0 3000 PSI Features all stainless and brass internal parts New design reduces sensitivity to entrapped air No external moving parts or springs Unique barb and flow balance design provid...

Page 21: ...3 15 16 22 24 25 28 29 INSTALLATION Select an unloader appropriate for the pressure and flow of your system see specification chart This unloading valve is a flow through design and should be mounted...

Reviews: