7. TERMS & CONDITIONS OF SALE

     

1. Work for special build machines will not commence unless a 30% deposit has been made and/or official 

purchase order has been received.

2. The final configuration and optional extras are to be agreed to before manufacturing commences. An extra cost 

for changing a model will apply after manufacturing has started (if this change leads to extra manufacturing cost 
or more expensive/extra components) and be charged as a variation cost. 

3. Ownership/title of all equipment remains the property of ThoroughClean until paid for in full. Warranty will only 

be available after this time.

4. Warranty is not service. Any calls placed to service equipment will be chargeable to the client. Earlier 

replacement of consumable parts than what is required by the maintenance schedule will be at the cost of the 
client (excluding of course any repairs/replacement of parts required under warranty).
Please see the LIMITED WARRANTY information elsewhere in this document.

5. All Rental Spec and Mine Spec model frames will have a hot dip galvanized finish unless elsewhere agreed to in a 

proposal offered to the client. Industrial Spec frames will have a painted finish.

6. Any additional spares, service kits, nozzle kits, etc are excluded, unless otherwise mentioned in the proposal to 

the client. 

7. Any extra installation and fitting expenses and all electrical or plumbing work required during installation will be 

at the cost of the client. It is the responsibility of the client to provide adequate pressured water supply of 
potable quality 15% more than the required flow of the pressure pump specification, and suitable power supply 
outlet for electrical units where applicable.

8. No responsibility will be taken for late delivery day due to unforseen circumstances. Please regard building times 

for special builds and machines out of stock as estimates only.

9. Sale of this unit/s is on an FOB Bundamba, QLD basis unless otherwise agreed to in writing in this proposal and it 

is the responsibility of the client to insure goods in transit.

10. Our price quoted is valid for 30 days only unless stated otherwise elsewhere in the quote.
11. Where deposits have been paid on special builds, such deposits will in part or in full become non-refundable 

once building has started. Should a customer decide to cancel an order - all labour and a re-stocking and 
administration fee for components will be charged to the customer and the balance (if any) repaid to the 
customer. Any special non-restockable components will be invoiced to the customer.

12. All prices quoted are excluding GST unless otherwise stated. 
13. All prices quoted does not include installation (where applicable) or training unless otherwise stated.
14. Installation and training service of $90/h available in Brisbane Metro only. Other sites subject to additional 

travel cost. 

15. IN NO EVENT SHALL THOROUGHCLEAN BE LIABLE FOR ANY INJURY, EXPENSES, PROFITS, LOSS OR DAMAGE, 

DIRECT, INCIDENTAL, OR CONSEQUENTIAL, OR ANY OTHER PECUNIARY LOSS ARISING OUT OF THE USE OR 
INABILITY TO USE ANY PRODUCT DESCRIBED IN THIS DOCUMENT. 

DISCLAIMER

: Although care has been taken to ensure the accuracy, completeness and reliability of the information 

provided, technical features may vary due to ongoing improvements and development.  The user of the 
information agrees that the information is subject to change without notice.

All manuals and user guides at all-guides.com

Summary of Contents for D10R-30C Trailer

Page 1: ...eneral 5 2 For Electric Units in General 5 3 Specific for this unit 5 4 MEDIC ALERT CARD 6 Warranties 7 Terms Conditions Additional Info as manuals drawings Pump By Pass Valve THOROUGHCLEAN WATER BLAS...

Page 2: ...gineered On purpose EWP Effective Working Pressure figures mentioned are theoretical only when machine is used with a turbo nozzle MMP Maximum Pump Pressure DRP De Rated Pressure Diesel Driven 10HP RE...

Page 3: ...ries 1000 litre IBC water tank bolted onto frame Heavy Duty all steel hot dip galvanized mounted hose reel 30m hose 50m optional Heavy Duty swing away jockey wheel Heavy Duty trailer hitch with integr...

Page 4: ...s enough water to keep going for a while and that there are no obvious water leaks o Visually check lance gun assembly Please read Safety Instructions and special Site Specific Instructions first 2 IN...

Page 5: ...a Fan Jet first blast off heavy soil or dirt build up 2 Apply detergent to partially cleaned surface using low pressure Apply detergent by spraying from bottom up to avoid streaking using a dual lanc...

Page 6: ...hose Ensure hose canvas sleeve is in place Lance Gun assemblies Check for damage and leaks Water Filters Check to ensure filters are clean filter heads tops are not cracked seals are not worn and sea...

Page 7: ...emove Clean Replace Blockages Debris in By Pass Valve Remove Clean Replace Therefore Check Suction Filters Pump Sucking Air Seal Suction Worn Piston HP Seals Remove Clean Replace Service Required PSI...

Page 8: ...PING FROM UNDER PUMP H P Piston Seals Worn or Check and Replace O Rings in Plunger Retaining Bolt Worn Check and Replace OIL DRIPPING FROM UNDER PUMP Piston to Crankcase Oil Seals Worn Check and Repla...

Page 9: ...nger Rod Oil Seals 3 pump Replace Brass Valves 6 pump Replace various seals 3 pump Replace Ceramic Piston Plungers if cracked or worn 3 pump WhenRequired 7 Check Oil Level in Pump Slave tank 8 Change...

Page 10: ...on the By Pass Valve using a By Pass kit Do a whole pump changeover at 1 000 hours Con Rods Big Ends Crankshaft Pistols swivels H P Hose damage is usually uneconomical to repair Replace when necessar...

Page 11: ...ed Engine By pass valve Pump premature wear tear Using Contaminated Fuel Had to remove fuel filter to keep engine running Excess Fuel system clean outs required If excessive corrosion in carburetor or...

Page 12: ...GHT SWIVELS TRHC0382 REEL HOSE 1 NY126 FILTER MESH WATER BLUE CP15941 4 SSPP TRHC2396 WATER FILTER 1 FLOAT RECOND KIT PA29 0282 84 TRHC0457 SEAT PA29 0285 81 TRHC0458 SEAL PA29 0288 20 TRHC0459 PIN 1...

Page 13: ...ater Always carefully test on a small area 10 i e Hat face eye protection wet weather gear boots and gloves particularly important if hot water sandblaster or aggressive chemicals are being used 11 Ch...

Page 14: ...pment PPE for High Pressure Cleaners This is a High Performance High Pressure Cleaner At a Minimum wear Overalls boots thick heavy gloves full face protection Additional equipment as instructed by sit...

Page 15: ...ell ventilated place away from your work area 3 Never run or operate in a confined space exhaust fumes are toxic Make sure there is plenty of free air flow around the engine to cool it and void exhaus...

Page 16: ...o the torso can involve internal organ damage Surgical consultation should be obtained Aggressive irrigation and debridement is recommended Surgical decompression and exploration may also be necessary...

Page 17: ...It is the consumer s responsibility to deliver the machine in question to our service premises or to the premises of our appointed agent at the consumer s expense for replacement or repair as applicab...

Page 18: ...oper or inadequate maintenance or improper storage Repair rendered necessary or arising from the use of parts or components other than approved by the manufacturer in writing Normal maintenance replac...

Page 19: ...sure pump specification and suitable power supply outlet for electrical units where applicable 8 No responsibility will be taken for late delivery day due to unforseen circumstances Please regard buil...

Page 20: ...All manuals and user guides at all guides com...

Page 21: ...All manuals and user guides at all guides com a l l g u i d e s c o m...

Page 22: ...All manuals and user guides at all guides com...

Page 23: ...All manuals and user guides at all guides com...

Page 24: ...All manuals and user guides at all guides com...

Page 25: ...All manuals and user guides at all guides com...

Page 26: ...All manuals and user guides at all guides com a l l g u i d e s c o m...

Page 27: ...All manuals and user guides at all guides com...

Page 28: ...Circuit diagram A Ferero D Cover 24 10 2011 Designed by Checked by Approved by Date 1 1 Edition Sheet Date Yellow Harness plug to F S Red E Stop Purple Water Yellow 85 86 30 87A 87 Black Brown F S Al...

Reviews: