19
K-Cube Piezo Driver
3.5 Verifying Software Operation
The APT Software should be installed (Section 3.1.) and the controller connected to
the actuators (see Section 3.4.) and the PC, before verifying software operation.
1) Run the APTUser utility and check that the Graphical User Interface (GUI) panel
appears and is active.
Fig. 3.4 Gui panel showing jog and ident buttons
2) Click the ‘Ident’ button. The digital display on the front panel of the associated
controller flashes. This is useful in multi-channel systems for identifying which
channel is associated with which GUI.
3) Click the jog buttons on the GUI panel to move the piezo or axis connected to the
controller. The voltage display for the associated GUI shou ld increment and
decrement accordingly.
Caution
In applications requiring the highest level of accuracy and repeatability, it
is recommended that the controller unit is powered up approximately 30
minutes before use, in order to allow the internal temperature to stabilize.