background image

 

 

 

Gas Conversion

 

 

Conversion Procedure 

 

CAUTION:

 

 

Ensure that  the appliance is isolated from the gas supply before commencing servicing. 

 

 

NOTE:

 

 

• 

These conversions should only be carried out by qualified persons. All connections must be checked for leaks before re-

commissioning the appliance. 

 

• 

Adjustment  of  components  that  have  adjustments  /  settings  sealed  (e.g.  paint  sealed)  can  only  be  adjusted  in 
accordance with the following instructions and shall be re-sealed before re-commissioning this appliance. 

 

• 

For all relevant gas specifications refer to the ‘Gas Specifications’ table at the end of this section. 

 

 

 Replace Orifice of Main Burners  

 
1. 

Turn off the gas supply at the mains supply. 

2. 

Remove the gas control knobs from the front control panel. The control knobs are a push fit onto the shaft of the 

gas control valves. 

3. 

Remove the front control panel by slackening the 4 screws on the front of the control panel and remove the panel 

from the front of the appliance.  Take care to disconnect the electrical connection lead from the rear of the piezo 
igniter fitted to the control panel. 

4. 

Unscrew and remove the Orifice (½” A/F) from the main burner end clamp. 

5. 

Determine the correct Orifice size for the corresponding gas from the rating label affixed right side of body. 

6. 

Replace with the correct Orifice size. Please refer to the following diagram. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NOTE:  

Unscrew Air-shut of Main burner to rotate to reasonable position until the flame is better, no yellow, no lifting 

when convert one gas to another gas by authorised person. 

 

 Replace Injector of Pilot Burners 

 

1.    To remove the pilot burner injector, Slacken the gas supply tube at the gas control unit end of the supply tube to 

allow the tube to be moved easily without bending. 

2.    Disconnect the gas supply tube from the base of the pilot burner and withdraw the pilot injector from inside the 

pilot burner. 

3. 

Determine the correct injector size for the corresponding gas from the rating label. 

4. 

Re-connect the supply tube to the base of the pilot burner and tighten the gas supply tube at the gas control 

unit end. 

5. 

Refit the front control panel and tighten the 4 screws on the front to secure the panel in place. 

 
 
 

Orifice of Main Burner 

18 

Summary of Contents for GL167-N

Page 1: ...vapors or liquids in the vicinity of this or any other appliances Keep the area free and clear of combustible materials WARNING Improper installation adjustment alteration service or maintenance can...

Page 2: ...ation Clearances Assembly Gas Connection Commissioning Install gas stand Operation 10 Operation Guide Lighting the Main Burner Cleaning and Maintenance 14 Routine Maintenance After Each Use Daily Clea...

Page 3: ...ATH READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS APPLIANCE WARNING INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE USER SMELLS GAS ARE TO BE...

Page 4: ...Single burner Heat Input 8 8 KW 8 8KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW Heat Total 17 6 KW 26 4 KW 17 6 KW 26 4 KW 17 6 KW 26 4 KW Burner Operating Pressure 20 mbar 37 mbar 28 30 mbar Supply Pressure 20 mba...

Page 5: ...4 Dimensions GL167 P GL167 N GL168 P GL168 N...

Page 6: ...ed by the manufacturer are only to be adjusted by an authorized service agent They are not to be adjusted by the installation person Unpacking Remove all packaging and transit protection from the appl...

Page 7: ...uired for this appliance is shown in the Gas supply requirements section of this manual Check the gas supply to ensure adequate supply pressure exists c Input Rate of this appliance is stated on the R...

Page 8: ...structions specified in the Operation section of this manual Light the Pilot Burner Light the Main Burner Turning Off the Main Burner Pilot b Ensure that the operator has been instructed in the areas...

Page 9: ...s of the stand on the floor ready for assembly You will need a screw driver to assist in the assembly process Step 1 Disconnect remove griddle plate upturn and support your gas equipment taking care a...

Page 10: ...9 Installation Step 3 Fix and tighten the screws Step 4 Locate the stand into required position and adjust the adjustable feet into a level position refit griddle plate Fixing screws...

Page 11: ...NT SEALED BY THE MANUFACTURER SHOULD NOT BE ADJUSTED BY THE USER OPERATOR 1 The Gas Griddles have been designed to provide simplicity of operation and 100 safety protection 2 Improper operation is the...

Page 12: ...manually light the pilot burner or use the piezo igniter provided optional 3 Release the gas control knob after approximately 10 20 seconds after lighting the pilot burner 4 The pilot burner should s...

Page 13: ...reate air cross currents within a room It is also necessary that sufficient air should be allowed to enter the room to compensate for the amount of air removed by any ventilating system Otherwise a su...

Page 14: ...irror like surface OPERATION Turn the burners on about 15 20 minutes before cooking for preheating Set the knobs to the desired flame height or temperature Each valve will control the gas flow to the...

Page 15: ...and prevents damage to the griddle plate surface INITIAL CLEANING Prior to operating your new griddle thoroughly wash the griddle surface and the exterior with a mild detergent or soap solution Do not...

Page 16: ...a qualified service person To achieve the best results cleaning must be regular and thorough and all controls and mechanical parts should be checked and adjusted periodically by a qualified service pe...

Page 17: ...ified service person TOUBLESHOOTING GUIDE PROBLEM POSSIBLE CAUSE Pilot burner cannot be lit The pilot valve is obstructed Pilot gas turned off pilot valve The pilot valve is bad Fat appears to smoke e...

Page 18: ...ntact your nearest authorized service branch When ordering replacement parts please quote the part number and the description listing below If the part required is not listed below request the part by...

Page 19: ...ectrical connection lead from the rear of the piezo igniter fitted to the control panel 4 Unscrew and remove the Orifice A F from the main burner end clamp 5 Determine the correct Orifice size for the...

Page 20: ...entification label located on the right hand panel Low Fire Adjustment The gas control valve is fitted with a maximum flow bypass blanking screw No adjustment is required Commissioning Before leaving...

Page 21: ...ble to get the appliance to operate correctly shut off the gas supply and contact the supplier of this appliance Gas Specifications Natural Gas LPG Category I2H I3B P I3 Main Burner Orifice 44 2 18mm...

Page 22: ...E G20 20 20 44 2 18 0 45 8 8 BE FR I2E G20 20 20 44 2 18 0 45 8 8 BE CH CZ IT ES FR GR GB HR LT NL PT SK IE SI I3P 37 G31 37 37 53 1 51 0 25 8 8 AT CH CZ DE DK FI FR GB GR IT NL NO SE I3B P G30 30 30...

Page 23: ...Explosion drawing GL167 P GL167 N 22...

Page 24: ...No include injector GL167 P GL167 N 01 22 1069541 2 FDS injector 0 25 GL167 P 01 20 1068512 2 FDS injector 0 45 GL167 N 01 20 1068513 2 10 Griddle plate assy GL167 P GL167 N 06 05 1471846 1 11 Flue as...

Page 25: ...67 P 01 20 1068653 2 Orifice for Natural Gas GL167 N 01 20 1068644 2 22 L connector GL167 P GL167 N 01 18 1067404 2 23 Main pipe assy GL167 P GL167 N 06 05 1471980 1 24 Gas stand GL167 P GL167 N 07 18...

Page 26: ...GL168 P GL168 N 25...

Page 27: ...No include injector GL168 P GL168 N 01 22 1069541 3 FDS injector 0 25 GL168 P 01 20 1068512 3 FDS injector 0 45 GL168 N 01 20 1068513 3 10 Griddle plate assy GL168 P GL168 N 06 05 1471867 1 11 Flue as...

Page 28: ...68 P 01 20 1068653 3 Orifice for Natural Gas GL168 N 01 20 1068644 3 22 L connector GL168 P GL168 N 01 18 1067404 3 23 Main pipe assy GL168 P GL168 N 06 05 1471980 2 24 Gas stand GL168 P GL168 N 07 18...

Page 29: ......

Page 30: ......

Page 31: ...V1 Rev1 12 14...

Page 32: ......

Reviews: