November 30th 2018
www.thonk.co.uk
14
God’s Box Lollipop
Eurorack DIY Kit
Instructions
Version 1
30.
Now connect the two PCBs together
and secure the three spacers with
screws.
Then you can replace the frontpanel
and screw everything on and place
the seven knobs onto the pots.
31.
The module is now complete. Affix
the power cable as shown with the
red stripe down – and facing the text
on the PCB that says ‘RED’
The trimming and calibration process
is detailed in the God’s Box
documentation linked below.
32.
The Lollipop calibration instructions can be found here:
www.thonk.co.uk/documents/gbox/lollipop/lollipop%20calibration.pdf
More info on God’s Box modules can be found at
http://godsbox.co.uk