Thomasville Nouveau series Installation Instructions Manual Download Page 3

5. 

Installing the base cabinets

If you prefer to install the upper cabinets first, skip Step 5. And proceed to Step 6. Installing the wall cabinets.  Once you’ve 
completed Step 6, return to this Step 5 and install the base cabinets. As with all base and wall cabinets, any necessary cut-
outs for utilities such as water, electricity or gas should be made in the back panel of the cabinet before installation.  Measure 
the location of the utilities carefully, transfer that to the back of the cabinet, and make a corresponding cut-out in the back 
panel of the cabinet, with a spade-bit, hole saw or jigsaw.

Start with the corner cabinet (if applicable). Slide the cabinet into the desired corner and determine if it needs to be shimmed 
up to the previously drawn line (34-5/8”). Shim as necessary with wood shims remembering the toe kick will cover the shims 
after it is applied. Check the top with a level and adjust the shims accordingly. When the corner cabinet is level, secure it 
through the cabinet hanger strip into the stud using 2-1/2” round washer head screw. The 2-1/2” wood screws that came 
with your installation kit may be inappropriate for your installation, depending upon the framing and construction of your wall.  
You are responsible for using the appropriate screws for your wall.

Repeat this process wherever studs fall behind the corner cabinet nailer strip. If your base corner cabinet is round, install 
strapping on the wall to support the counter top and keep the cabinets square.

It may be helpful to install the round base corner cabinet to the adjacent cabinet before leveling and positioning. If there is 
no adjacent cabinet to the round base corner unit, leave it unfastened until countertops are installed. Secure it in position by 
installing it to the underside of the countertop.

Base corner cabinet installation:

when a base corner cabinet is not 

up against another cabinet, a panel 

may be installed to close in the side.

Install strapping on wall 

to support countertop

24

24

Blind corner installation:

pull blind corner cabinet far enough 

from wall B, (distance x) to allow 

the  cabinet door to clear hardware 

on adjacent cabinet or appliance.

x

Wall A

W

al

l B

Wood 

corner cabinet

Right side shows

Filler

Adjacent 

cabinet

Slide the next cabinet into position so that side is flushed and plumb against the side of the previously installed corner 
cabinet. Using C-clamps, clamp the two cabinets together and shim under the cabinet where necessary. Check to ensure 
the cabinet is level. Screw the cabinets together using 1-1/8” wood screws. You may want to pre-drill these holes to prevent 
splitting or cracking. Use four wood screws to join the two cabinets together.

When the two cabinets are secured together, secure the cabinet to the wall, following the 34-5/8” line, using 2-1/2” round 
washer head screws through the cabinet hanger strip into any available studs behind the cabinet. Complete the installation of 
the base cabinets using the same procedure. If there is a window above your base cabinets, be sure to appropriately center 
the cabinet under the window.

Summary of Contents for Nouveau series

Page 1: ...contact with utilities behind a wall during installation please contact a licensed contractor to install the cabinetry tools needed Pencil Square Pry bar Hammer Miter saw Safety glasses Shims Caulk g...

Page 2: ...s very important that cabinets are firmly attached to wall studs for the optimum amount of support Be sure to avoid electric gas or water lines or other utilities that might be behind the wall when lo...

Page 3: ...pport the counter top and keep the cabinets square It may be helpful to install the round base corner cabinet to the adjacent cabinet before leveling and positioning If there is no adjacent cabinet to...

Page 4: ...ets Be sure to center the cabinet above the stove and between any window openings your cabinetry will surround After checking the cabinet to ensure that it is level and plumb secure it through the upp...

Page 5: ...ethod would be to install the filler against the side of the cabinet as in Figure B 4 Helpful Hint When determining the location of your fillers during the planning stage it is wise to place them if p...

Page 6: ...oles Tip Make a jig by measuring and marking the drill locations for knob and or pulls to aid in decorative hardware installation Cardboard jig Scrap block Door 9 Continuing care Our finishes feature...

Page 7: ...hanism at front of drawer A Vertical Adjustment Slide front of box Figure 8 clip adjustment melamine and hardwood Melamine and Hardwood drawer boxes are attached with figure 8 clips The oval shaped sl...

Reviews: