4
Installation
Unpack and check carefully there is no transportation damage before using the unit. Keep the
equipment packaging. To fully protect the product against vibration, dust and moisture during
transportation or storage use the original packaging or your own packaging material suitable
for transport or storage, respectively.
Place the unit on a flat surface. The unit should be installed horizontally, a maximum deviation
of 15° is allowed. The device requires 20 cm clearance at the sides and above.
Installation
fog machine
18
Summary of Contents for STAIRVILLE M-Fog 3000 Pro
Page 1: ...M Fog 3000 Pro fog machine user manual...
Page 11: ...Warning signs Type of danger Warning danger zone General information M Fog 3000 Pro 11...
Page 21: ...6 Connections and controls 4 5 PUSH PUSH Connections and controls M Fog 3000 Pro 21...
Page 46: ...Notes fog machine 46...
Page 47: ......
Page 48: ...Musikhaus Thomann Hans Thomann Stra e 1 96138 Burgebrach Germany www thomann de...