pg. IX
4 . 2 . 3
4 . 2 . 3
4 . 2 . 3
4 . 2 . 3
4 . 2 . 3
HO
HO
HO
HO
HOW
W
W
W
W T
T
T
T
TO MOUNT
O MOUNT
O MOUNT
O MOUNT
O MOUNT THE COMP
THE COMP
THE COMP
THE COMP
THE COMPA
A
A
A
ACT BOILER CASING
CT BOILER CASING
CT BOILER CASING
CT BOILER CASING
CT BOILER CASING
Figura 1
Figura 2
H
I
M
G
L
F
M
E
F
CP
C
P
After positioning and levelling the boiler by raising or lowering the mounting feet, connecting it to the heating system and to the electrical system
(see para. 4.4, 4.5, 4.6, 4.7, 4.8 and 4.9 ),proceed to mount the casing as illustrated:
- Firstly remove the protective film from the casing.
- Next mount the 2 side panels (F) by inserting the 2 holes
of the bottom fold on the pins of the base and fastening
the 2 top screws with a screwdriver.
- Fasten the front cover (C) by fitting it onto the side
panels.
- Fasten the door (P) to the left side with the special
hinges and screws provided.
- Lastly fit the back cover (CP) on the front cover (C) and
fasten the hinges with the screws provided.
If you prefer the door (P) can be mounted with the handle
on the left and the hinges on the right. Simply remove the
handle (M) from the door and fix it to the holes on the left
side of the door, remove the 3 hinges (T) and fix them to
the right side of the door. Similarly, remove the magnet
from the right side of the door and mount it on the left side
of the door.