The user is obliged to ensure of the correct use of the boiler in accordance with this manual which is 

a condition of acceptance of the warranty. In addition, it is strictly forbidden to intervene in any manner 

into the secured parts in the boiler! 

 
Notice:   

The setting of output range of the boiler and other parameters must be in accordance with the technical 

data. Any overloading and incorrect use of the boiler may cause the devaluation of its components. The 

warranty cannot be applied for such damaged components.

 

 

General instructions: 

Before the electric boiler is put into operation, make sure to check the following: 

 

connection to the heating system 

 

opening of the fitting separating the electric boiler and the system and securing the fitting against 

unauthorized handling 

 

check that the system is filled with soft water (or check the pressure) and that no air is present in the 

system 

 

electrical connections and protection in accordance with CSN. See chapter “Electric boiler assembly”. 

 

Start-up procedure: 

 

switch on the main circuit breaker (switch) in the supply line, turn on the boiler by pressing and holding 

the 

 

(ON) button. 

 

Set the required output temperature of the boiler to the maximum value 

 

check that all the safety thermostats and controls operate properly 

 

The electric boiler is very easy and fast to operate and no special qualifications are required for it. 

However, 

the boiler shall only be operated by adults who have been familiarized with the boiler function and 
operation.

  Such instructions shall be provided by the installer when the boiler is connected and put into 

operation. 

 

 

When the display is on, there is control mains voltage in the boiler.  

 

Set the room thermostat (or another external control) to the required temperature. 

 

Press the arrow-up key to display the current heating water temperature. Press the 

 

(ON) button to 

turn on the boiler. At the same time, the circulation pump will turn on and remain in operation for the 

time given by the parameters set. The heating function is indicated by the LED indicator with the 

 

symbol.  When the temperature setpoint  is reached, the automatic system will switch off the heating 

bodies one by one so as to maintain the heating water temperature setpoint within the limits given by 

the parameters. 

 

Initial heating:

  maintains the highest possible operating temperature of the  medium in the heating 

system for 4 hours. During operation, bleed the air from the system carefully so as to get rid of any 

remaining air after bleeding in cold condition.  When the system has cooled down, refill it with water. 

 

In case of a power cut (or HDO signal interruption depending on the settings), the boiler will be put out 

of operation. When power is restored, the electric boiler will resume operation automatically.  

 

Do not place any objects inside the electric boiler or on its casing.   

 

The minimum water pressure on the input to the circulation pump shall be 0.5 bar 

 

Setting the pressure in the expansion vessel 

Once the system has been filled with a heat-conductive medium and air has been bled out of the system 

properly, take a note of the water pressure in the system shown on the display. Adjust the value of filling 

overpressure of the air in the expansion vessel by bleeding the air out until the same value is achieved. Fill the 

system with water until the system pressure reaches a value higher by10 kPa. If the filling overpressure of air in 

Summary of Contents for THERM ELN 15

Page 1: ...09 2015 Installation operation and maintenance manual for electric boilers User s Manual Version September 2015 THERM ELN 8 THERM ELN 15...

Page 2: ...ONING 13 9 GRAPH OF CONNECTING OVER PRESSURE VALUES OF HEATING WATER THAT CAN BE APPLIED 15 10 EL CONNECTION OF THERM ELN BOILERS 16 11 WARRANTY AND RELIABILITY FOR DEFECTS 18 12 INTERCONNECTION WITH...

Page 3: ...e boiler but is part of the el switchboard for the given flat or house During installation of the electric boiler there needs to be sufficiently dimensioned main contactor or switch properly marked co...

Page 4: ...ce error messages Possibility to set selected boiler parameters service menu Brief description of the main advantages of the THERM ELN electric boiler Easy and intuitive control The control system is...

Page 5: ...s under uniform thermal load if possible and the rods are under uniform operating load Switching system of the boiler by HDO The THERM ELN boiler signals and responds to commands from the HDO receiver...

Page 6: ...plicant needs to request a preliminary approval with the potential connection of higher input power and request the relevant rate If new central heating is constructed or an old one reconstructed we r...

Page 7: ...33 2130 ed 2 2009 In addition to that it shall not be installed in zone 3 either if there is a chance that a jet of water intended for cleaning might be present When the boiler is installed in permiss...

Page 8: ...e boiler installation and commissioning shall be appropriately recorded in the warranty card No interventions with the internal wiring of the boiler unless otherwise mentioned in this manual e g conne...

Page 9: ...d in the following wiring diagrams The THERM ELN boiler is able to control its output automatically It is fitted with its own PID regulation which prevents the boiler from overheating beyond the tempe...

Page 10: ...O receiver is a device which carries out the required switching operation e g blocks unblocks the appliance based on the evaluated HDO signal Evaluating the HDO signal The automatic system is factory...

Page 11: ...heating water temperature pressure in the system instantaneous power failure number The parameter to be displayed is selected by pressing the SELECT button in the middle The parameter which is current...

Page 12: ...erature control with analogue control voltage at the Ui input is set You can change the data on the display with the arrow keys When the C LED indicator is flashing it indicates the mode in which the...

Page 13: ...nected and one level of output will be switched on The heating operation will stop as soon as the output water temperature exceeds 15 C If the lower limit of the required heating water temperature is...

Page 14: ...ion When the display is on there is control mains voltage in the boiler Set the room thermostat or another external control to the required temperature Press the arrow up key to display the current he...

Page 15: ...ng system The outer casing can be cleaned e g with a cloth soaked in soap water and wiped dry Putting the boiler out of operation The boiler can be turned off for a shorter period of time by pressing...

Page 16: ...16 10 Electrical connection of THERM ELN boilers Electrical connection of THERM ELN 8 boilers STORAGE TANK HEATING MODULE STORAGE TANK HEATING MODULE...

Page 17: ...17 Electrical connection of THERM ELN 15 boilers STORAGE TANK HEATING MODULE STORAGE TANK HEATING MODULE...

Page 18: ...epair costs by the customer THERMONA spol s r o provides a warranty on its products in accordance with the terms and conditions specified in the warranty card delivered with the product Conditions for...

Page 19: ...tor and supply terminals Connection of the DHW module and servicing of the electrical system of the boiler may only be carried out by authorized service companies The storage tank is heated by automat...

Page 20: ...ted control system 9 Heating rod 10 Emergency thermostat and temperature sensor pocket 11 Vent valve 15 THERM ELN 15 boiler set 1 Boiler frame 2 Emergency thermostat the sensor is situated in the pock...

Page 21: ...21 16 Dimensions and connections 1 Return water inlet male thread 2 Safety valve outlet 3 Return water outlet male thread 4 Inlet for the system recharge male thread 5 Supply cable grommet...

Page 22: ...aging shall be disposed of in paper waste collection points wrapping film shall be discarded in recycling bins intended for plastics Parts of the boiler made of steel copper and copper alloys shall be...

Page 23: ...d recommendations When used under conditions recommended by the manufacturer its operation is safe Measures have been taken to ensure compliance of this appliance being launched to the market with tec...

Reviews: