The Terminator ZP/FAK-1 Split Bulkhead Entry Kit is designed to 

make a waterproof seal over the end of TubeTrace and terminate 

Thermon electric heat trace in an approved junction box. Review 

Instructions prior to installation. Kit will make one connection.

INSTALLATION PROCEDURES

Installation Precautions 

•  To minimize the potential for arcing on electrical heat tracing 

and fire caused by product damage or improper installation, 

use ground-fault protection. 

•  Installation must comply with Thermon requirements and be 

installed in accordance with any applicable national and local 

codes.

•  Component approvals and performance ratings are based on 

the use of Thermon specified parts only. User supplied power 

connection fittings must be listed or certified for intended use.

•  De-energize all power sources before opening enclosure.
•  Keep ends of bundles, heat tracing and kit components dry 

before and during installation. 

•  Individuals  installing  these  products  are  responsible  for 

complying with all applicable safety and health guidelines. 

Proper  personal  protective  equipment,  or  PPE,  should  be 

utilized during installation. Contact Thermon if you have any 

additional questions.

Terminator ZP Certifications/Approvals  

2. 

Trim heat tracing to within 305 mm–381 mm 

(12”–15”)  of  the  end  of  the  insulation.  If 

self  regulating  heat  trace  proceed  to  step 

3.  For  Zone-type  heat  trace  continue  with 

indentification of bus connection on step 2a.  

1. 

Remove outer jacket and insulation from tubing 

bundle  as  included  from  end  of  the  tubing 

bundle. Ensure sufficient heat trace is available 

for  electrical  connection.  See  instructions 

included with heat trace PETK kit (purchased 

separately).

2a. 

Strip back bundle insulation 38 mm (1-1/2”) 

to  76  mm  (3”)  beyond  bus  connection 

heat 

tracing. If bus connection indentation is less 

than 305 mm–381 mm (12”–15”) from end of 

the heat tracing, proceed stripping the bundle 

insulation to the next indentation. 

3. 

Wrap tubes and heat tracing with pass of heat 

reflective tape (25% overlap). Then wrap with 3 

passes of glass fiber tape (50% overlap), or until  

fiber tape is equal to original bundle insulation 

thickness.

4. 

Complete  with  additional  passes  of  heat 

reflective tape.

Trim as Required

 

for Connection

Tubing Bundle

Tubing

Heat Tracing

Tubing

Self-Regulating Heat Tracing

Heat Tracing

305 mm–381 mm

(12”–15”)

Insulation

Zone Type Heat Tracing 

Tubing

Bus Connection

Indentations

(Zone Heater Only)

305 mm–381 mm

(12”–15”)

Insulation

Glass Fiber Tape

Heat Reflective Tape

Heat Tracing

5. 

Cut FAK-1 top and base ends to match outside 

diameter  of  tubing  bundle  and  remove  end 

pieces.

Heat Reflective Tape

Glass Fiber Tape

Heat Tracing

Tubing

CAUTION

 

(Found on TubeTrace SE/ME bundles)

 

Do not cut or damage the heat 

trace or sampling tube.

Tubing Bundle

Cut and Remove 

to fit

Heat Tracing

Field Drilled

 

(By Others)

IP66/Type 4X  -60°C ≤ Ta ≤ +55°C
Listed Heat Tracing Cable System 137M
Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T4-T6
09.2238691,-G,-S, Ex e IIC T4-T6

FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C 

1725           II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM 10ATEX0058X

Summary of Contents for Terminator ZP/FAK-1

Page 1: ...Terminator ZP FAK 1 For Bulkhead Entry of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES ...

Page 2: ...VSX HT PETK 2D for KSX HTSX PETK 3D for FP HPT Required Order Separately for each heater to be fabricated A mm inch B mm inch C mm inch D inch mm Terminator ZP FAK 1 220 mm 8 5 8 277 mm 11 7 8 107 mm 4 1 4 171 mm 6 3 4 D B A C 8 7 Terminator ZP FAK 1 Kit Contents Item Quantity Description 1 1 Expediter Assembly Flat Mount Base Grommet Threaded Grommet Compressor and Support Cap with O Ring 2 1 Jun...

Page 3: ...ndle as included from end of the tubing bundle Ensure sufficient heat trace is available for electrical connection See instructions included with heat trace PETK kit purchased separately 2a Strip back bundle insulation 38 mm 1 1 2 to 76 mm 3 beyond bus connection heat tracing If bus connection indentation is less than 305 mm 381 mm 12 15 from end of the heat tracing proceed stripping the bundle in...

Page 4: ...ket and work up over FAK ends FAK 1 Bottom Cover FAK 1 Top Cover RTV Sealant 12 Apply RTV bead to back of FAK 1 flange prior to securing to bulkhead RTV Bead Backside View Stainless Steel Bolts 14 Apply RTV bead around FAK 1 flange 13 Secure FAK 1 to bulkhead wall using 8 eight stainless steel bolts Note stainless steel bolts washers and nuts provided by others Recommended bolt size is 8 32 8 Asse...

Page 5: ... junction box base Align Slots Dimple for Center Line Drilled thru 1 Wall 21 Completed Terminator ZP FAK 1 for bulkhead entry of electrically heated TubeTrace bundles Power Connection Bulkhead 17 Install quick mount terminal blocks twist to position and tighten screws By others for power connection application Terminal Blocks Typical 18 Complete system wiring between fabricated heat tracing and po...

Reviews: