Page 22
CONTRACT
OR
16.5
Cut the two drain tubes and insert them in the rigid pipe. Note that the main silicon
drain tube must
have a minimum length of 18”
to allow the siphon to work properly. It is important to leave an air gap
between the soft tubes and the rigid pipe.
16.6
Open the water supply valve (fully counter-clockwise) to bring water to the humidifi er and let the water
pressure enter the system.
16.7
Follow the water supply path completely and carefully check for leaks at the fi ttings.
Summary of Contents for ACU-STEAM
Page 2: ......
Page 32: ...Page 30 CONTRACTOR ...
Page 34: ...HUMIDISTAT ...
Page 39: ...HUMIDISTAT 5 8 dia DRILLING TEMPLATE FOR DUCT MOUNT HUMIDISTAT ...