Ignition and shutting down of stove
Ignition sequence and description of regulation
Basic function of the regulation is to secure reliable ignition of used fuel, optimal
conditions for combustion and controled sequence for shutting down. Depending on
working power, and complexity of the heating system, parameters are read and
controled differently. Some of the most important ways of working are described with
relevant values.
Before start up following things needs to be checked:
Silo needs to be filled with pellet
Silo doors needs to be closed
Combustion chamber/basket needs to be cleaned
Ash pot needs to be clean
All doors on stove needs to be closed
Stove must be connected to electric source - 220 V, 50 Hz
7.1
Ignition
Press and hold button 4
for 3 (three) seconds. Stove will start with
ignition.
START
will be displayed, on the left side of display we see that igniter and suction
fan are activated. Mark
tON
is showing that room thermostat is connected or
overbridged on conncection for room thermostat (deafult).
After that, on display we have text
LOAD PELLET
and on the left side we see
that feeding of pellet is activ.
Summary of Contents for INTERIO
Page 2: ......
Page 6: ...5...
Page 14: ...13...
Page 24: ...23 5 Connection 5 1 Hydraulic schemes for connection...
Page 25: ...24 5 2 Electrical wiring diagram...
Page 31: ...30...
Page 32: ...31 6 3 1 Clock adjustments Clock adjustments can be done on following way...
Page 34: ...33 Sheme 2 Sheme 3 Sheme 4...
Page 50: ...49...