Thermocet Apertura series Operating And Installation Instructions Download Page 3

Page.3 

We wish you happy heating with the purchase of this  gas fire. 
Please read these instructions carefully before you install the fire and start using it. 
Keep these instructions in a safe place. 
Always quote type and serial number in the event of a problem. 
 
 

1. General 

 

The Apertura is delivered complete. You should inspect the appliance for damage in transit immediately on 
delivery. Any damage found should be reported without delay and as precisely as possible to your supplier. 
Please refer to the delivery document in this connection. Your fire is coated with heat-resistant enamel that 
can withstand extremely high temperatures. Burn the fire at high during the first hours of use and ventilate 
the room well. The curing of the enamel may produce a smell/smoke, but this is harmless, however. 
After the window has cooled down, any marks on the glass should be removed immediately with glass 
cleaner. 

 
Important information 

The Apertura must be installed, connected and inspected by a recognized installer, in accordance with na-
tional and regional standards. The appliance must be checked by the installer for gas tightness to gas and 
combustion products and the correct operation of the various components and functions. In addition, the 
flue system and the outlets in external walls or roof surface must comply with current regulations. The fire 
falls within the category of  closed appliances in an installation space, without blower and with a flue loss 
in excess of 17 % (non-condensing). 
 

Guarantee ( see page 21 and 22) 

Always complete your guarantee card in full and return it to your supplier immediately after purchase.  
Type and serial numbers are shown on the plate that you will find in the control box. 
(See Page 12 diagram 1-14). 
 

Contents of package 

1 x Completely mounted appliance: Front, Corner or Panorama 
1 x Flexible gas hose 
4 x Adjustable feet 
2 x Stabilizer plate 
4 x Bolts M6 x 10 
4 x Bolts M6 x30                                 
8 x Nuts M6 
1 x Convection set (2x gr flexible aluminium tube) 
1 x Log set 7 pieces 
1 x Restricting plate 
1 x Bag incandescent granules 
1 x Bag incandescent material 
1 x Control box incl. Remote Control 
1 x 9V block (alkaline recommended) 
4 x AA 1.5V (alkaline recommended) 
1 x Operation and installation instructions 
1 x Guarantee card 
1 x Delivery document 
1 x Mantle iron incl. adjusting bar (depending on model) 
 

 

Summary of Contents for Apertura series

Page 1: ...Page 1 OPERATING AND INSTALLATION INSTRUCTIONS Apertura line...

Page 2: ...tinguishing Warning Maintenance 3 Preparations for installing the Apertura Page 6 4 Installation instructions for the Apertura with concentric duct connection Page 7 General instructions Components of...

Page 3: ...e appliance must be checked by the installer for gas tightness to gas and combustion products and the correct operation of the various components and functions In addition the flue system and the outl...

Page 4: ...but this can also be done by pushing the timer button Setting the required temperature Press the auto button until the display starts to flash Use the high low buttons to set the required tempera ture...

Page 5: ...e settings are adjusted by means of the auto and timer modes press one of the high low buttons in order to see whether the transmit symbol appears in the top left of the display and the green LED on t...

Page 6: ...re extinguishing the appliance completely Now turn knob A1 to the right as far as it will go to position push the knob in and then turn it to position Warning After extinguishing the pilot light wait...

Page 7: ...ead Section 5 Concentric duct system on page 8 before installing the ap pliance in connection with the necessity of fitting the restriction sheet First dismantle Front 11 12 or 13 depending on the ver...

Page 8: ...terial See Page 15 A Position the log set as shown on Page 15 Do this with care since soot may be formed if the log set is wrongly positioned You finally position and fit the glass the glazing beads a...

Page 9: ...tive length per bend 1 metre until the maximum pipe length of 12 metres is reached including bends but excluding vertical terminal The minimum length is 3 metres The outlet may oc cupy any position on...

Page 10: ...allation of the vertical terminal The outlet can be placed at any arbitrary position on the roof surface inlet and outlet in identical pressure areas but must comply with the current regulations Use a...

Page 11: ...ry I3p b I3p b I3p b I3p b I3p b I3p b Country NL SP FR BE DE GB Pre Pressure MBAR 50 30 37 30 37 30 37 30 50 50 37 30 Burner Pressure MBAR 36 29 4 36 29 4 36 29 4 36 29 4 36 29 4 36 29 4 Injection Bo...

Page 12: ...Page 12 1...

Page 13: ...Page 13 5 2 4 3...

Page 14: ...Page 14 G25 G20 30 31 7 49 G25 55 G20 30 31 6...

Page 15: ...Page 15 A...

Page 16: ...Page 16 8 9 10 11 12...

Page 17: ...Page 17...

Page 18: ...Page 18 A E B C F I H G K L J M N O P...

Page 19: ...KET 12965024 12965524 D NOT AVAILABLE E CONCENTRIC BEND 90 12965014 12965514 F WALL BAND ADJUSTABLE 12965026 G ADJUSTABLE LENGHT 250 12965006 H FLAT ROOF PLATE 12965020 12965520 I LOCKING BAND 1296503...

Page 20: ...Page 20...

Page 21: ...liance is fitted with insulated covering one of the following materials should only be used Loose white insulation wool heat resistant to 1000 C Rocktherm 180 012 insulation wool 700 C from Rockwool o...

Page 22: ...ot covered by the guarantee Defects caused by inexpert assembly and or treatment Costs of transport assembly and dismantling Glazing fire gratings refractory stones flue gas baffle plates heat shields...

Reviews: