9.1
Flue (fig. 12)
The heater has a flue stack connection.
1. Push a T-piece (A) directly over the
connection (B).
2. Push the flue pipe (C) on the T-piece.
3. Use three screws to secure the flue pipe
to the T-piece.
•
The flue must point upwards.
•
The flue (or any part of it) may not be
positioned horizontally. A 45° angle is
acceptable.
•
It is not allowed to lengthen the flue
connection horizontally.
•
When a pipe is used at 45°, pipe pieces
of at least 1 m must be fitted in front of
and at the back of the slanting pipe.
•
The flue must stick out at least 0.5 m
above the apex of the building.
•
Keep the vertical part at the back of the
heater as long as possible before leading
it outside through the wall.
4. Fit the following pipe pieces.
5. Place a cap (D) on the end of the flue.
9.2
Diameter of flue
/i
10
EC DECLARATION OF
CONFORMITY
For the EC declaration of conformity, go to
www.thermobile.nl.
Caution
The flue must meet the following
requirements.
BIO ENERGY 2
150 mm
Summary of Contents for Bio Energy 2
Page 1: ...40 020 953 rev 05 2015...
Page 71: ...Bio Energy series 40 020 953 rev 05 2015 71 p 1 1 1 1 2 2 A B C D 1 3...
Page 72: ...72 40 020 953 rev 05 2015 Bio Energy series P 1 4 2 2 2 150 900 450 20 C...
Page 75: ...Bio Energy series 40 020 953 rev 05 2015 75 p 10 11 4 3 4 1 1 1 5 E 2 2 20 30 5 3 3 2 5 E 5 C...
Page 76: ...76 40 020 953 rev 05 2015 Bio Energy series P 4 4 1 4 2 1 0 5 5 1 i 10 30 12 X X X...
Page 77: ...Bio Energy series 40 020 953 rev 05 2015 77 p X X X 4 I X X X X X 8 2 mmwk X X X 12...
Page 81: ...Bio Energy series 40 020 953 rev 05 2015 81 p i 1 2 1 5 3 500 C 4 5 6...
Page 82: ...82 40 020 953 rev 05 2015 Bio Energy series P 7 3 8 9 3 4 10 11 12...
Page 83: ...Bio Energy series 40 020 953 rev 05 2015 83 p 13 5 3 9 12 13 14 15...
Page 84: ...84 40 020 953 rev 05 2015 Bio Energy series P 7 8 16 2 11 12 13 14...