Pretreatment system
Initial start up | 13
Initial start up
Putting the system into
operation
•
Verify if all connections are secure and correct.
•
Turn the feed-water ON. Verify no leaks are present in the
tubing, connectors, cartridges, etc. Turn the water
purification system (i.e. Smart2Pure Pro) downstream of
the Pretreatment system ON. Check for leaks once the
downstream water purification system starts production.
•
Verify that all pressure gauges are showing pressure
readings.
•
If no leaks or blockages are found, close the
Pretreatment system’s front door and allow operation to
continue.
Operating Elements
1. Prefilter Inlet
•
Indicates water pressure after the regulator, before
entering the Prefilter
2. Prefilter Outlet
•
Indicates water pressure after the Prefilter
3. Carbon Filter Outlet
•
Indicates water pressure after the carbon filter
Figure 11. Pretreatment system gauge
CAUTION:
Check that all connections have been
made as described in the
Installation
section.