![Thermo Scientific Barnstead Pretreatment System Installation And Operation Manual Download Page 14](http://html.mh-extra.com/html/thermo-scientific/barnstead-pretreatment-system/barnstead-pretreatment-system_installation-and-operation-manual_1104977014.webp)
10 | Typical Installation
Pretreatment system
Typical Installation
Figure 10. Bench setup
Corrective measures
•
All tubing and cartridges must be checked for their
correct position on the system and that no leakage or
blockage after opening the feed-water supply.
•
To avoid tripping, ensure that the tubing does not lay over
the floor.