30
Flame Sensor (“Cad Cell”) Checkout Procedure
On the Honeywell oil primary control, to check the electrical resistance of the flame
sensor (referred to as a cadmium sulfide photocell, or “cad cell”), depress the reset
button on the oil primary safety control while the burner is firing. The oil primary control
will report the measured resistance range of the cad cell by flashing the LED (light
emitting diode) one (1) to four (4) times. Refer to the oil burner manufacturer’s
instructions for further details.
For all primary controls, an alternate procedure to check the flame sensor operation is
as follows:
1)
Remove the flame sensor lead wires from the terminals (labeled “CAD
CELL” on the underside of the Honeywell control) of the oil primary safety
control module. Start the burner. Shortly after combustion is established,
place a temporary jumper wire across the cad cell terminals, or leads, of
the control. Connect an ohmmeter across the flame sensor lead wires.
The measured resistance should be less than,
•
1600 Ohms for the Honeywell cad cell.
2)
Stop the burner and remove the jumper wire.
3)
With the burner off, measure the resistance of the flame sensor with the
ohmmeter. The resistance of the sensor without “seeing” a light source
(so-called “dark” cell resistance) should be greater than,
•
20,000 Ohms for the Honeywell cad cell.
4)
If the sensor resistances are outside the acceptable ranges given above,
confirm the lens of the cell is clean and the cell is located correctly in the
burner housing. If the cell is clean and correctly located, replace the flame
sensor.
NOTICE: All resistances are approximate values only and will vary
depending upon the intensity of the light source (flame or sunlight) and the
condition or age of the cad cell.
Replacement Parts
Appendix D of this manual contains a list of replacement parts available for these
furnaces.
Summary of Contents for VC-BBP Spirit Series
Page 39: ...39 APPENDIX B ELECTRICAL DIAGRAMS VH BBP VH BNP VLF BBP VLF BNP VLR BBP VLR BNP Models...
Page 40: ...40 VC BBP VC BNP Models...
Page 47: ...47 APPENDIX D REPLACEMENT PARTS Highboy Model...
Page 48: ...48 Lowboy Front Flue Model...
Page 49: ...49 Lowboy Rear Flue Model...
Page 50: ...50 Horizontal Counterflow Model...
Page 51: ...51...
Page 52: ...52...