7
ENGLISH
INSTALLATION
INSTALLATION
WATER CONNECTIONS
AD
N
N
A
B
C
D
E
F G
H
I
L
M
A
B
C
O D
P
E
F
Q
G H
I
L
M
O
DF
AD
TBPS 1000
AD
TBPS 750
TBPS 200 - 550
TBPS 750 - 1000
UAC
MC
Psc
RL
RC
M
Psr
R
EAF
UAC
MC
Psc
RL
RC
M
Psr
R
EAF
DF
DESCRIPTION
TBPS
200
300
430
550
750
1000
UAC
Domestic hot water outlet
1” M
1"1/4 M
Ø
MC
Outlet from boiler
1” M
1” M
Ø
RC
Return to boiler
1” M
1” M
Ø
M
Outlet from solar collector
1” M
1” M
Ø
R
Return to solar collector
1” M
1” M
Ø
RL
DHW recirculation
1” M
1” M
Ø
EAF (SB) Domestic cold water inlet
1” M
1"1/4 M
Ø
Psc
Diameter/length of boiler sensor socket
16/180
16/180
mm
Psr
Diameter/length of solar controller sensor socket
16/180
16/180
mm
AD
Quantity/diameter/length of magnesium anode
1/33/450 1/33/450 1/33/520 1/33/520 1/40/600 1/40/600 mm
DF
Flange internal diameter
130
130
130
130
130
130
mm
A
171
171
208
207
75
75
mm
B
243
253
329
348
289
289
mm
C
403
393
427
443
428
421
mm
D
598
693
684
788
799
834
mm
E
738
903
824
1088
969
1006
mm
F
878
1113
964
1328
1144
1337
mm
G
953
1233
1064
1428
1234
1426
mm
H
1029
1323
1174
1538
1321
1506
mm
I
1098
1438
1289
1653
1444
1637
mm
L
1170
1670
1440
1784
1707
2032
mm
M
1338
1838
1644
1988
1846
2171
mm
N
Ø 604
Ø 604
Ø 755
Ø 755 Ø 1000 Ø 1000 mm
O
M8 threaded inserts for grounding point/accessory
handles connection
700
700
700
700
600
600
mm
P
-
-
-
-
555
-
mm
Q
-
-
-
-
-
1237
mm
b
It is recommended to install shut-off valves at domestic water inlet and outlet.
b
Check the efficiency of the seals when filling/refilling the storage cylinder.
b
In case of a probe, any electric junction between probe cable and extensions for the connection to the electric panel must
be soldered and protected with a sheath or a suitable electric insulation.
b
To access M8 threaded inserts in models 750 - 1000, outer lining must be removed, as indicated on page 6
b
Install the magnesium anode supplied (for the models 750 and 1000).