background image

MAXIMUM HEIGHT OF 

TOWEL WARMER

O 4 7/8"
OD OF MOUNTING PLATE COVER

SECURE TOP BASES
TO HEADER USING
EIGHT (8) SCREWS 
PROVIDED.

27 7/8"

3 1/4"

3 1/4"

SECURE BOTTOM BASES 
TO WALL USING EIGHT (8) 
TOGGLE BOLTS PROVIDED

O1" (FOR 1/2" CONDUIT)

O1/2" (FOR TOGGLE BOLTS)

23"

O1" (FOR 1/2" CONDUIT)

(1) BLACK AND (1) GREEN WIRE

(1) WHITE AND (1) GREEN WIRE

^ THIS SIDE UP ^

LHGTW-XX MOUNTING TEMPLATE

SCALE 1:1

A

B

STEP 2: PREPARE TO INSTALL THE THERMIQUE  HEATED-GLASS TOWEL WARMER

A. 

CAUTION:

 A licensed electrician MUST professionally install the Thermique Towel Warmer.

B.  To properly ground the Towel Warmer, ALL wiring must be in accordance with the National Electric Codes and  

Local Codes.  

C.  Choose wall locations for both the Towel Warmer and the Controller.  

NOTE:  The Towel Warmer comes with 10’ of wire. If you choose to locate the controller further than 10’ from  

the Towel Warmer, an additional, intermediate junction box is needed.

D.  Install the controller junction box.  

NOTE:  The controller is approved for installation in a standard size, single-gang junction box. However,  

if the controller is installed in a metal box with conduit connections, we recommend using a dual-gang  
box with a single-gang mud-ring to allow extra space for connections.

 

E.  On your chosen wall location and using (Fig 1), mark the locations of the upper and lower Mounting  

Bracket screw/bolt holes. Attach a horizontal header across the points where the upper Mounting Brackets  
will be installed. Make sure the locations of the lower Mounting Brackets match up with the wiring.

F.  Install electrical conduit between the controller junction box, intermediate junction box (if used) and each of the 

lower brackets of the Towel Warmer as required by applicable electrical codes. The holes in the finished wall surface 
for the conduit corresponding to each of the lower Mounting Bracket center holes should be between 5/8” - 3/4”.

G . The Towel Warmer is designed to be installed by directly attaching the two lower Mounting Brackets to standard 

1/2” electrical conduit using the small screws on the bracket. The toggle bolts are then used to secure the bracket to 
the wall (Fig 2). The conduit must be installed so that it aligns with the center holes of the lower Mounting Bracket 
locations, as indicated on (Fig 1). The conduits should protrude a minimum of 1” and no more than 1 1/2” from  
the finished wall surface. Make sure the conduit is level and plumb across the centers of the protruding ends.

Figure 1

For LHGTW-24

A = 24”
B = 19 1/8”

Reviews: