MAXIMUM HEIGHT OF
TOWEL WARMER
O 4 7/8"
OD OF MOUNTING PLATE COVER
SECURE TOP BASES
TO HEADER USING
EIGHT (8) SCREWS
PROVIDED.
27 7/8"
3 1/4"
3 1/4"
SECURE BOTTOM BASES
TO WALL USING EIGHT (8)
TOGGLE BOLTS PROVIDED
O1" (FOR 1/2" CONDUIT)
O1/2" (FOR TOGGLE BOLTS)
23"
O1" (FOR 1/2" CONDUIT)
(1) BLACK AND (1) GREEN WIRE
(1) WHITE AND (1) GREEN WIRE
^ THIS SIDE UP ^
LHGTW-XX MOUNTING TEMPLATE
SCALE 1:1
A
B
STEP 2: PREPARE TO INSTALL THE THERMIQUE HEATED-GLASS TOWEL WARMER
A.
CAUTION:
A licensed electrician MUST professionally install the Thermique Towel Warmer.
B. To properly ground the Towel Warmer, ALL wiring must be in accordance with the National Electric Codes and
Local Codes.
C. Choose wall locations for both the Towel Warmer and the Controller.
NOTE: The Towel Warmer comes with 10’ of wire. If you choose to locate the controller further than 10’ from
the Towel Warmer, an additional, intermediate junction box is needed.
D. Install the controller junction box.
NOTE: The controller is approved for installation in a standard size, single-gang junction box. However,
if the controller is installed in a metal box with conduit connections, we recommend using a dual-gang
box with a single-gang mud-ring to allow extra space for connections.
E. On your chosen wall location and using (Fig 1), mark the locations of the upper and lower Mounting
Bracket screw/bolt holes. Attach a horizontal header across the points where the upper Mounting Brackets
will be installed. Make sure the locations of the lower Mounting Brackets match up with the wiring.
F. Install electrical conduit between the controller junction box, intermediate junction box (if used) and each of the
lower brackets of the Towel Warmer as required by applicable electrical codes. The holes in the finished wall surface
for the conduit corresponding to each of the lower Mounting Bracket center holes should be between 5/8” - 3/4”.
G . The Towel Warmer is designed to be installed by directly attaching the two lower Mounting Brackets to standard
1/2” electrical conduit using the small screws on the bracket. The toggle bolts are then used to secure the bracket to
the wall (Fig 2). The conduit must be installed so that it aligns with the center holes of the lower Mounting Bracket
locations, as indicated on (Fig 1). The conduits should protrude a minimum of 1” and no more than 1 1/2” from
the finished wall surface. Make sure the conduit is level and plumb across the centers of the protruding ends.
Figure 1
For LHGTW-24
A = 24”
B = 19 1/8”