thermionics laboratory, inc  
3kW Rod fed e-gun manual Page 5

 

 
FINAL CHECK PRIOR TO PUMPDOWN 

 
1.  Turn on the water and check visually for leaks. 
2.  Make sure the crucible is loaded with material. 
3.  Visually check the high voltage and sweep leads making sure you have ½ inch 

clearance around all high voltage leads. Make sure the sweep leads do no pass 
directly behind the source (if they must make sure to install a grounded shield around 
them). 

 
At this point you are ready to pump down the system. 
 

WARNING: e-GUN SYSTEMS REQUIRE AN INDEPENDENT EARTH GROUND IN 
ADDITION TO POWER SUPPLY RETURN AND SAFETY GROUND. SEE APPENDIX B 
FOR DETAILS. 

 

e-GUN OPERATION 

 

1.  Make sure the vacuum chamber is operating at a pressure less than 5x10^-4 Torr.  
2.  Make certain all interlocks are operating properly. All grounds must be secure. 
3.  Turn on the e-GUN cooling water (this should be interlocked to the high voltage 

power supply). 

4.  Assure desired crucible is selected and properly located. 
5.  Set the power supply emission current potentiometer to zero. 
6.  Turn on the power supply and check to see that all interlocks are satisfied. 
7.  Turn on the high voltage. Thermionics 150-0040 3kW power supplies use a fixed 

voltage. If using a variable voltage power supply, slowly bring up voltage to negative 
4,200 volts DC. 

8.  Turn on the emission current and slowly increase the potentiometer until you see a 

slight glow on the tip of the rod. This will normally appear as a blue glow at an 
emission current of about 20 to 30 milliamperes. Slowly increase the power to 50 
milliamperes, or until you can clearly see the beam spot.  

9.  Advance the rod as the material melts down to the crucible.  Typical advancement 

is 2-3mm. 

 

Note:

 The e-gun is factory set to locate the beam just off the center of the crucible. If 

the crucible is not close to center you must make adjustments. If you have a variable 
voltage power supply, adjust the voltage to center the beam. If you do not have 
variable voltage, you will need to make magnetic adjustments to the e-gun. Contact 
the factory for adjustment procedures. 

 
DEPOSITING MATERIALS THAT MELT  
 

After following the above procedure (steps 1 through 8), continue to slowly increase 
power in 20 to 30 milliamp increments. If the material appears unstable (flickering light or 
waves in the melt) stop and let it set until it re-stabilizes (you may have to reduce power if 
stability cannot be restored). Arcing will occur and is normal in e-Gun evaporation. Stop 
increasing power when arcing is observed and let the source soak until arcing stops (on 
melting materials arcing is normally caused by outgassing).  Continue to increase power 
until reaching the desired rate. 
 

Summary of Contents for e-Gun RCRF-0325

Page 1: ...laboratory inc 3kW Rod fed e gun manual Page 1 Model RCRF 0325 0338 3 kW Rod Fed e Gun Evaporation Source Manual Thermionics Laboratory Inc Modesto CA 95351 Phone 209 529 8357 Fax 209 529 8449 www the...

Page 2: ...tion source uses a beam of focused electrons to vaporize material in a high vacuum environment The vaporized material then condenses on an object called a substrate in the same high vacuum chamber to...

Page 3: ...t 1 gpm at 50 psi C High Voltage power supply TLI model 150 0040 or equivalent TO INSTALL THE E GUN SYSTEM 1 Mount the e gun in the chamber Make sure that the source is grounded to the chamber 2 Conne...

Page 4: ...given to removal of all glass from the parts after cleaning glass is a dielectric material and will cause severe arcing if left on the source Inspect the crucible bore and ensure that it is clear of a...

Page 5: ...r supply slowly bring up voltage to negative 4 200 volts DC 8 Turn on the emission current and slowly increase the potentiometer until you see a slight glow on the tip of the rod This will normally ap...

Page 6: ...will in many cases still see some hazing on the e gun source this is normal during evaporation As the e gun becomes coated with these materials hazing may increase e GUN SHUT DOWN Once the desired rat...

Page 7: ...etween the beam former and the anode should be checked to assure a spacing of 040 inches 8 When looking down on the filament you should see 1 3rd of the filament exposed The filament beam former and a...

Page 8: ...the original manufacturer s warranties This warranty does not extend to Thermionics products that have been subject to misuse neglect accident or improper application nor shall it extend to units tha...

Page 9: ...us to determine the cause of failure In all cases Thermionics has sole responsibility for determining the cause of failure and sole discretion in determining the nature and extent of adjustment if an...