![Thermionics e-Gun RCRF-0325 Manual Download Page 3](http://html1.mh-extra.com/html/thermionics/e-gun-rcrf-0325/e-gun-rcrf-0325_manual_1104120003.webp)
thermionics laboratory, inc
3kW Rod fed e-gun manual Page 3
INSTALLATION
The following components are required for customer installed rod fed e-gun systems:
A. Interlock switches: water, vacuum and high voltage access.
B. Filtered water at 1 gpm at 50 psi.
C. High Voltage power supply. TLI model 150-0040 or equivalent.
TO INSTALL THE E-GUN SYSTEM
1. Mount the e-gun in the chamber. Make sure that the source is grounded to the
chamber.
2. Connect all interlocks.
3. Connect external grounds (mandatory power supply ground and independent earth
ground); high Voltage cables and sweep cables per power supply manual(s).
4. Assure water flow of 1 gpm with a pressure of 30 psi or above.