M 536991350901122020
THERMEX
TOP LINK III
47
EN
g
LI
sH
»
INS
TALL
ATION
OF
T
OP
L
INK
1 - Hood
Click the button next to the battery, as shown on the illus-
tration. The hood will open for pairing for one minute.
Hold down the button for fan control until all lights blink
five times(around 10 seconds). The hood is now open for
pairing for one minute.
Slider: Hold down “ON/OFF” for 10 seconds. The hood is
now open for pairing for one minute.
Glass Touch panel: Hold down ”Timer” for 15 seconds.The
hood will now be open for pairing for one minute.
INSTALLATION OF TOP LINK
Top Link
must be connected to the electrical current for the oven or hob. The transmitter is connected in accordance with the diagram
.
CONNECTION BETWEEN TOPLINK AND HOOD
Once the Top Link is connected, the hood and Top Link must be paired to each other. One hood can be connected to multiple Top Link modules.
The pairing can be carried out in the following way:
N
L3
L2
L1
ON
DIP
1
2
3
4
N
L3
L2
L1
Dipswitch
Diode - PWR
Diode - SET1
Button - PAIR
Button - SET LEVEL
Power output Power input
Fuse
-
+