EN
3
Index
I
GENERAL
4
II
WARNINGS
5
III
INSTALLATION
7
III.1 PRELIMINARY INDICATIONS
7
III.1.a AIR TREATMENT
9
III.2 INSTALLATION ON UP TO 660 mm DEEP BASES
10
III.2.a INDUCTION HOB INSTALLATION
11
III.2.b EXECUTIVE DIRECTIONS
13
III.3.c ASPIRATION UNIT ASSEMBLY
16
III.3 INSTALLATION ON UP TO 840mm DEEP BASES
18
III.3.a INDUCTION HOB INSTALLATION
21
III.3.b EXECUTIVE DIRECTIONS
23
III.3.c ASPIRATION UNIT ASSEMBLY
26
III.4 INSTALLATION ON UP TO 900mm DEEP BASES
28
III.4.a INDUCTION HOB INSTALLATION
29
III.4.b EXECUTIVE DIRECTIONS
31
III.4.c ASPIRATION UNIT ASSEMBLY
34
III.5 INSTALLATION ON BASES DEEP MORE THAN 900mm
36
III.5.a INDUCTION HOB INSTALLATION
39
III.5.b EXECUTIVE DIRECTIONS
41
III.5.c ASPIRATION UNIT ASSEMBLY
44
III.6 ELECTRICAL CONNECTION
46
IV
OPERATION
49
V.1 INDUCTION HOB TECHNICAL FEATURES
49
V.2 APPROPRIATE POTS FOR INDUCTION
50
V.3 INDUCTION HOB OPERATION
51
V.4 COOKER HOOD OPERATION
63
V
CLEANING AND MAINTENANCE
68
VI.1 INDUCTION HOB CLEANING
68
VI.2 COOKER HOOD CLEANING
70
VI
TROUBLESHOOTING GUIDE
72
VII
DISCONTINUATION, DISASSEMBLY AND WASTE DISPOSAL
74