A
B
A
C
1
2
3
4
5
E
D
6
F
7
1.
INSERT PART
A
INTO BASE OF PART
B
2.
SCREW THIS IN TO BREECH HOLE
3.
SLIDE PART
C
ON TO TUBE
B
AND CUT
4.
SLIDE ON COPPER OLIVE
D
5.
LUBRICATE THREAD OF PART
C
& OLIVE
D
6.
TIGHTEN PART
E
OVER PART
D
AND
C
7.
SCREW ON PART
F
CHROME COVERS
CHROME
COVER
B
ENSURE BREECH IN THE WALL IS
CLEAR OF ANY OBSTRUCTION.
USE BOX SPANNER TO TIGHTEN
SLIDE ON
COPPER OLIVE
B
A
F
FOLLOW INSTRUCTIONS IN ORDER FROM 1 TO 7
(2 OF EACH)
PARTS IN ORDER OF FITTING
E
D
C
B
CUT BRASS ROD TO LENGTH
WITH PIPE CUTTER 25mm
FROM TILE FACE
E
PUSH IN PAST 1st O RING ONLY
DO NOT
PUSH IN
FULLY
(SUPPLIED WITH SHOWER VALVE)
(SUPPLIED WITH SHOWER VALVE)
PATENT FILE APP 2016900927 REGISTERED DESIGN 201611384
NOTE: DO NOT MAKE THE COMPRESSION JOINT DRY! YOU MUST LUBRICATE
THE THREAD AND OLIVE TO BE ABLE TO COMPRESS THE OLIVE.
CHROME
COVER
PAGE 5.
BOX B
( IF THE BREECH IS SET BACK IN THE WALL )
IF THE BREECH HAS A BAD SEATING USE PTFE ON BOTH FITTINGS
B
(HOT & COLD SIDE ). ONE SEATING MUST BE GOOD.
LUBRICATE O RINGS
USE PTFE IF SEATING IS BAD
LUBRICATE MALE
THREAD
& OLIVE
IMPORTANT
PART
C
46mm SPANNER ON
C
22mm SPANNER ON
E
MAKE COMPRESSION JOINT
SUPPLIED
WITH SHOWER VALVE
C
D
NOT NECESSARY
Summary of Contents for RENO KIT
Page 18: ......