![THE SHOWER LAB VR01S100 Manual Download Page 8](http://html1.mh-extra.com/html/the-shower-lab/vr01s100/vr01s100_manual_1100500008.webp)
02/2021 V 1.0
VIEW 01
02/13
Ensure the Wall Profile is vertical by
using a spirit level.
Mark the positions of the pre-drilled
holes.
Remove the Wall Profile and drill holes
with a 6mm high quality drill bit for a
clean and precise hole.
Fully insert the wall plugs and fix the
Wall Profile in place.
Take the Wall Profile Soft Seal and push
the seal into place on the vertical Wall
Profile to cover the screws.
Ensure the fin is on the inside (wet
side). Use the Nylon Block to help.
Using purpose built "Glass Lifters",
position and sit the glass on to the
Underframe Gasket and push against
the Wall Profile.
Note the orientation and position of
the Panel, this can be determined by
any holes or attached labels.
Professional Tip
If drilling ceramic tiles, place
masking tape on the tiles before
marking and drill through the
tape to prevent the drill bit from
skidding.
DO NOT use Hammer Action as
this will break the tiles.
05
06
07
08