03/2021 V 1.0
VIEW 09
06/20
Measure and check the distance from
the Inline Panel to the Return Panel at
the bottom and at the top are equal.
Ensure there is adequate glass in both
the Wall Profiles. (6mm is
recommended)
Apply the Rigid Seals to the dry side of
the Wall Profiles starting from the
archway of the Wall Profile up to the
top.
Gently tap the Wall Profile Rigid Seal
into place using a rubber mallet with
the Nylon Block to protect the Glass
and the Wall Profile.
=
=
Flush
6mm min
Wall Pro
fi
le
Glass Panel
Rigid Seal
Glass Panel
21
22
23
24