![The Road Wave TRW2 Assembly, Care And Use Instructions Download Page 6](http://html1.mh-extra.com/html/the-road-wave/trw2/trw2_assembly-care-and-use-instructions_1100471006.webp)
6
PREPARATION
ASSEMBLY INSTRUCTIONS
PREPARATION
Wall Mount Installation
After choosing an installation location, use a stud
finder to locate and mark wall stud.
Note:
Wall mount screw holes are 16” on center.
Place wall mount (B) onto wall between marked studs.
After making sure wall mount is level, mark four screw
locations.
1
16”
on
cen
ter
16”
on
cen
ter
Stud
Stud
2
1
1
2
B
2050
MAX PSI
1.4
MA
X GPM
Before beginning assembly of product, make sure all
parts are present. Compare parts with package contents
list and hardware contents list. If any part is missing or
damaged,
DO NOT
attempt to assemble the product.
Please call customer service at 1-866-235-5112.
Replacement parts will be sent no charge.
Estimated Assembly Time: 10 minutes.
Tools Required for Assembly (not included):
Phillips screwdriver, drill, 1.8" drill bit, 3/16" drill bit,
stud finder, pencil, level.
3/16"
1/8"
done by qualified service personnel.
Replacement parts for a double-insulated product must
be identical to the original parts.
A double-insulated product is marked with the words
“Double Insulation” or “Double Insulated”. Product may
also be marked with symbol shown here.
Double Insolated Product
SAFETY INFORMATION