background image

Tools/Outils/Herramientas

Before You Begin

CAUTION: Risk of property damage.

Do not support the bath by the bath rim.

The bath must be supported by the bath base or bath feet. If the load weight of
the bath is supported by the perimeter of the bath rim, property damage will
occur.

Observe all local plumbing and building codes.
Carefully plan moving the bath into the installation area. This bath will not easily

fit through doorways.
When planning the installation area, provide access to all final plumbing

connections for servicing.
To ensure a successful installation, the floor must be level.
Adequate floor support must be provided. Consult the roughing-in sheet packed

with the bath for specific floor loading requirements.
When selecting finished floor material, do not exceed 2

(5.1 cm) thickness. This

will ensure the integral apron will be flush with the finished floor.
When selecting finished wall material, do not exceed 1-1/2

(3.8 cm) thickness.

This will ensure the finished wall material will overlap the integral apron

columns.
This bath is designed for alcove installations only.
Apron baths are not reversible. If the drain and the faucet supplies are located on

the left end of the alcove area, the installation requires a left-outlet bath.

Plus:/Plus:/Más:

• #6 large-head galvanized nails
Clous galvanisés #6 à tête large
Clavos del #6 galvanizados de cabeza grande
• Conventional woodworking tools and materials
Outils et matériels conventionnels de menuiserie
Herramientas y materiales convencionales de carpintería
• Drop cloth/Bâche de protection/Lona
• Plastic liner (optional)
Revêtement en plastique (optionnel)
Cubierta de plástico (opcional)
• RTV silicone sealant (optional)
Mastic à la silicone VTA (optionnel)
Sellador de silicona RTV (opcional)
• Construction adhesive (optional)
Adhésif de construction (optionnel)
Adhesivo de construcción (opcional)
• Cement or mortar (optional)
Ciment ou mortier (optionnel)
Cemento o mortero (opcional)
• 2x4s or 2x6s/2x4 ou 2x6/Listones de 2x4 ó 2x6
• Water-resistant wall material
Matériau hydrorésistant du mur
Material impermeable de la pared
• Rag/Chiffon/Trapo
• Finished wall material
Matériau du mur fini
Material de acabado de la pared

Kohler Co.

3

1084213-2-B

Summary of Contents for K-1100-LA

Page 1: ...K 1115 RA K 1123 LA K 1123 RA K 1125 LA K 1125 RA K 1150 LA K 1184 LA K 1184 RA K 1193 LA K 1193 RA K 1195 LA K 1195 RA K 1197 LA K 1197 RA K 1199 LA K 1199 RA K 1219 LA K 1219 RA K 1229 LA K 1229 RA...

Page 2: ...moment de la publication A la compagnie Kohler nous aspirons remplir notre mission d am liorer le niveau de vie gracieux pour chaque individu affect par nos produits et services Nous nous r servons l...

Page 3: ...ial will overlap the integral apron columns This bath is designed for alcove installations only Apron baths are not reversible If the drain and the faucet supplies are located on the left end of the a...

Page 4: ...planification de l emplacement d installation fournir l acc s aux connexions de plomberie finales pour le d pannage Pour assurer une installation r ussie le sol doit tre nivel Un support ad quat doit...

Page 5: ...eleccionar el material de acabado de las paredes no exceda un grosor de 1 1 2 3 8 cm Esto asegurar que el material de la pared acabada se sobrepondr a las columnas del fald n integral Esta ba era est...

Page 6: ...epresentantes de servicio al cliente en caso de que usted necesitara ayuda en el futuro Guarde este manual para referencia futura 1 Prepare the Site Flooring NOTICE Adequate floor support must be prov...

Page 7: ...prevent the surface of the bath from scratching during the installation process Pr parer le site Sol NOTICE Un support ad quat doit tre fourni Consulter le plan de raccordement emball avec la baignoi...

Page 8: ...O La ba era debe instalarse en un encajonado entre tres paredes AVISO Al construir la estructura de postes de madera tome en cuenta el espesor de los materiales de la pared acabada Construya una estru...

Page 9: ...subfloor Reposition as needed Verify the bath is 1 level across the top of the bath and 2 plumb along the drain side If the bath is not level shims must be used under the leveling blocks Connect the...

Page 10: ...lation V rifier que les blocs de mise niveau reposent directement sur le plancher Repositionner au besoin V rifier que la baignoire est 1 niveler le long du dessus de la baignoire et 2 galiser le long...

Page 11: ...nsen directamente en el subpiso Cambie la posici n seg n sea necesario Verifique que la ba era 1 est a nivel en la parte superior de la ba era y 2 est a plomo del lado del desag e Si la ba era no est...

Page 12: ...rebord de la bride de cloutage Utiliser des clous galvanis s 6 large t te ou des vis pour s curiser la bride de cloutage aux montants Fije la ba era a la estructura de madera AVISO Aseg rese de que el...

Page 13: ...bon acc s toutes les connexions de la plomberie Raccorder le siphon au drain Installer les valves du robinet conform ment aux instructions du fabricant du robinet Ne pas installer la bague du robinet...

Page 14: ...s Install the finished wall material 1 4 6 mm above the bath deck This will create a groove to apply the silicone sealant Apply a bead of silicone sealant in the groove between the finished wall and t...

Page 15: ...ure de robinet conform ment aux instructions du fabricant Termine la instalaci n Retire con cuidado la cinta protectora del borde de la ba era Aplique una tira de sellador de silicona en el reborde de...

Page 16: ...er les surfaces Pour l information d taill e de nettoyage et des produits consid rer visiter www kohler com clean Pour commander des informations d entretien et de nettoyage composer le 1 800 456 4537...

Page 17: ...remplacement ou du r glage appropri et ceci apr s toute inspection faite par Kohler Co de tous d fauts dus une utilisation normale et ceci pendant un 1 an partir de la date d installation Kohler Co n...

Page 18: ...ohler Co Attn Customer Care Center 444 Highland Drive Kohler WI 53044 U S A o llame al 1 800 4KOHLER 1 800 456 4537 desde los Estados Unidos y Canad o al 001 877 680 1310 desde M xico TODA GARANT A IM...

Page 19: ...Kohler Co 1084213 2 B...

Page 20: ...1084213 2 B...

Reviews: