![TGW NBS 90 PolySort Installation, Operation & Maintenance Manual Download Page 66](http://html.mh-extra.com/html/tgw/nbs-90-polysort/nbs-90-polysort_installation-operation-and-maintenance-manual_1099140066.webp)
NBS®90 PolySort & SP IOM
P/N: 1193974
Revision Date: 4/25/2019
Page
66
of
83
10.2: M
AINTENANCE
S
CHEDULE
Periodic maintenance intervals shown may vary with load, speed, hours of daily operation, ambient
temperature, humidity, etc. Intervals can be established by fairly frequent maintenance at first, then
lengthen the intervals as justified by observation of need based on history. The following is based on 5
days per week, 8 hours per day under normal conditions.
Daily
•
Listen to everything for unusual noises or vibration.
•
Visually inspect to see that conveyor sections are clear and free of debris.
•
Check to see that all safety guards are in place.
•
Check any oil leakage.
•
Check any unusual noises or vibration.
•
Check for loose bolts or parts.
•
Check air filter bowls for accumulated water.
•
Listen for air leaks.
Weekly
•
Inspect bearings, gear reducers and motors for excessive noise or heat.
•
Clean breather cap on gear motor (if used).
•
Check operation of all electrical controls.
•
Inspect motor mounting bolts.
•
Check for proper PSI on air regulators.
•
Prohibit riding on conveyor by anyone.
•
Think before making any adjustments. It may prevent an
injury. Remember, all moving components are potentially
dangerous.
•
Protect yourself from unexpected starts when working on a
stopped unit by locking and tagging the control panel or
disconnect switch that supplies power to the unit.
WARNING