06
3.1 Check before operation
Before operation, please carefully check and ensure the following items:
The installation position of the EV Charging Box should be convenient for operation
and maintenance. The EV Charging Box shall be properly installed using the
mounting bracket included in the accessories.
No external objects or parts are left on top of the EV Charging Box.
3.2 Power on the equipment
A. Confirm that all the above pre-operation inspection items meet the
requirements
.
E . RFID version : after the self-test is completed ,the indicators blue stable .It will be
valid within 5 minutes if you do not connect the car. Otherwise, you need to swipe
the card again.
5 cards as standard.
D. Standard version: After the self-test is completed, the indicators blue light flashes
for cable version, the indicators blue steady light for free/socket version and the EV
Charging Box is ready for use and you can connect to you Electric Vehicle.
C. After the EV Charging Box is connected to the power supply, allow for 7 seconds
of startup self-test time, and the indicator light will be displayed switching between
red, blue and green.
B. Switch on the power supply inlet circuit breaker
.
3. Charging Process