Keep check record as Table2 Table 2
Unit inspection
Unit name
Inspection on technical cocuments
1.Packing
Problem and treatment
Inspector
4.Others
3.User s manual
'
2.Qualified card
1.Packing lisk
5.Others
4.Fan and motor check
3.PCB check
2.Unit treatment
copy pcs
copy pcs
copy pcs
copy pcs
Year Month Date
4 4 Check the power of the unit
■
Before installing the unit, must check the specifications of power capacity,
power cord and switch, to ensure the unit accord with secure request.
■
The power of the unit should be connected with the special power switch with
leakage protection function.
.
If the request above is not met, the installer must refuse to install the unit.
NOTE
13
!