G3 Tugger
®
System
Greenlee / A Textron Company
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
10
Boom Setup
1. Place puller in approximate position of conduit.
2. Align nose with conduit and lock it in place with long
detent pin.
3. Butt nose up against conduit threads and conduit
locking nut. Place clamping plate inside of conduit
and tighten knurled nut. Take lock nut off temporar-
ily for more thread engagement if needed.
4. If the conduit is free standing or without threads,
position the nose so that the conduit will butt up
against the flats of the clamping plate.